Real-Time Flood Monitoring and Management of a Mississippi River Pipeline Crossing

2016· article· en· W2554667588 on OpenAlexaffabout
Martin Devonald, Mike Hill, Peter X.‐K. Song, Hamish Weatherly, Lauren Vincent

Bibliographic record

VenueVolume 3: Operations, Monitoring and Maintenance; Materials and Joining · 2016
Typearticle
Languageen
FieldEngineering
TopicGeotechnical Engineering and Underground Structures
Canadian institutionsBGC Engineering (Canada)
Fundersnot available
KeywordsGeohazardFlood mythPipeline transportEnvironmental scienceHydrology (agriculture)Flow (mathematics)Water levelFlow measurementFlooding (psychology)GeologyGeotechnical engineeringGeographyEnvironmental engineering

Abstract

fetched live from OpenAlex

Enbridge Liquids Pipelines (Enbridge) operates over 26,000 km of liquid pipelines in Canada and the US, administers a system-wide geohazard management program to identify, investigate and monitor geohazards, and performs remediation as required. An integral part of the geohazard management program is real-time flood monitoring, where pipeline watercourse crossings affected by flooding are identified and flood levels monitored. Watercourse crossings where the pipelines have a high potential to become exposed, to span, and potentially to fail during a flood event are studied in more detail. This flood monitoring program automatically monitors publicly available real-time stream gauge flow measurements and compares these measurements to estimated discharge thresholds for the crossing under evaluation. Thresholds are related to the current pipeline depth of cover (DOC) and the amount of scour that can occur over a range of flood magnitudes. Thresholds include: 1) the estimated peak flow to expose the top of the pipe, “exposure flow”, 2) the estimated peak discharge and associated flow velocities that could create enough free spanning pipe for the onset of vortex induced vibration (VIV) fatigue failure, “flow of concern”, and 3) where additional mechanical assessment taking account of specific pipe properties, data requirements and circumstances has been carried out, the “critical flow”, the estimated average peak flow and duration that has the potential to result in product release due to VIV once a sufficient pipe span length has developed, “critical flow”. This paper is a case study of an assessment and flood monitoring of one of Enbridge’s Mississippi River pipeline crossings, which has a history of flood-related pipeline exposure and subsequent mitigations. During real-time monitoring of a 2015 flood event the “exposure flow” and “flow of concern” thresholds for this crossing were exceeded, resulting in a decision by Enbridge to shut down the pipeline. Subsequent surveys revealed that the pipe had become exposed and was spanning adjacent to the previously remediated area. The previous mitigation likely limited the length of pipe exposure and pipe span. Added complexity was encountered during the post shutdown DOC survey, which needed to be completed as quickly and safely as possible after flood levels declined to allow for an assessment of the actual condition of the pipeline prior to restart. This paper presents a methodology that could allow pipeline operators to identify river crossings susceptible to pipe exposure, and the potential for freespan development, due to flooding, by providing an understanding of what is likely happening to the cover over the pipe at a particular crossing during a flood event. This provides a tool to better manage pipeline river crossings experiencing flooding. As far as the authors are aware, this case study represents the first time a pipeline has been shut down based on real-time flows and thresholds in the United States.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Bench or experimental · Consensus signal: Bench or experimental
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.330
Threshold uncertainty score0.731

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.008
GPT teacher head0.217
Teacher spread0.209 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designBench or experimental
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2016
Admission routes2
Has abstractyes

Explore more

Same venueVolume 3: Operations, Monitoring and Maintenance; Materials and JoiningSame topicGeotechnical Engineering and Underground StructuresFrench-language works237,207