A Multi-Objective Scheduling Algorithm for Multi-Mode Resource Constrained Projects in the Presence of Uncertain Resource Availability

2021· article· en· W3125454972 sur OpenAlexaff
Mehrdad Pouya, Aidin Delgoshaei, Ahad Ali

Notice bibliographique

RevueBrazilian Journal of Operations & Production Management · 2021
Typearticle
Langueen
DomaineEngineering
ThématiqueBIM and Construction Integration
Établissements canadiensToronto Metropolitan University
Organismes subventionnairesnon disponible
Mots-clésComputer scienceScheduling (production processes)ScheduleFair-share schedulingDynamic priority schedulingGenetic algorithm schedulingMathematical optimizationJob shop schedulingHeuristicRate-monotonic schedulingOperations researchIndustrial engineeringEngineeringMathematicsArtificial intelligence

Résumé

récupéré en direct d'OpenAlex

Goal: The issue of resource allocation is a major concern for project engineers in the scheduling process of a project. Resources over-allocation are often seen in practice after the scheduling of a project, which makes scheduling unhelpful. Modifying an over-allocated schedule is very complicated and requires a lot of effort and time. Besides, during the scheduling process of resource-constrained projects in the constructing companies, managers should concern more than one objective at the same time. This research aims to propose a new heuristic algorithm for minimizing project completion time, cost or maximizing quality of execution of activities simultaneously while multi-mode activities are taken into consideration. Design / Methodology / Approach: In this research, a new heuristic method is proposed for solving multi-objective scheduling problem for multi-mode resource constrained project scheduling problems (MRCPSPs) where the aim is maximizing the net present value (NPV) of project, minimize completion time and maximize the quality of executing activities simultaneously and along with emerging the uncertainty of resources availability and activity durations. The proposed method is then coded by Matlab® 2016. Results: The outcomes of solving small, medium and large scale case studies, the following results achieved: (i) the algorithm could solve all problems in different circumstances with no difficulties; (ii) the large scale problems (with 200 activities, 20 resources and 3 execution modes for each activity) could be solved in 4.43 seconds. (iii) in none of the studied cases over-allocation problem. The proposed method can be considered among the fastest scheduling algorithms found in the literature. In addition, it is found that makespan, NPV and quality have co-relation must be taken into consideration during the scheduling process. Limitations of the investigation: The main limitations of this research is that it only covers resource constrained project scheduling. Moreover, risk factors associated with the objectives of this research have yet to be addressed in future research studies. Practical implications: The performance of the algorithm is validated by using 24 series of dataset that are found in the literature. In order to verify its performance in real practice, it has been applied for a part of a construction project in Malaysia. The outcomes indicated that the algorithm scheduled the problem with 23 activities, 5 constrained resources and 2 execution modes in less than a second and with no over-allocations. The proposed multi-objective algorithm allows the project managers to consider NPV, completion time and quality of activities while scheduling a multi-mode project. In practice, this algorithm can provide a better atmosphere for managers while they aim to consider more than one objective during the scheduling process. Originality / Value: The proposed algorithm is original and can be of great value for future studies and managers in preventing resource over-allocation during the scheduling of multi-objective multi-mode resource constraint project scheduling. Moreover, it can help project managers to find near optimum solutions for complex multi-objective resource constraint projects faster and also with more accuracy.

Récupéré en direct depuis OpenAlex et désinversé. Les résumés ne sont pas conservés dans cette base de données : les index inversés représentent 8,6 Go des 9,3 Go de texte de la base, et le serveur dispose de 13 Go libres.

Comment cette classification a été obtenuedéplier

Prédiction distillée sur la base complète

Imitation des enseignants

Ni prévalence calibrée, ni vérité terrain. Validation humaine à venir. Apprise à partir de 10 348 étiquettes directes de Codex et de 10 348 étiquettes directes de Gemma. Le mode candidate est l'union des têtes enseignantes seuillées; le consensus est leur intersection. Ces sorties portent le statut machine_predicted_unvalidated et ne sont ni des étiquettes humaines ni des étiquettes directes de modèles de pointe.

score de la tête « metaresearch » (Codex)0,001
score de la tête « metaresearch » (Gemma)0,000
Version: codex-gemma-dda1882f352aStatut de validation: machine_predicted_unvalidated
Catégories candidatesaucune
Catégories consensuellesaucune
DomaineSignal candidat: aucune · Signal consensuel: aucune
Devis d'étudeSignal candidat: Simulation ou modélisation · Signal consensuel: Simulation ou modélisation
GenreSignal candidat: Méthodes · Signal consensuel: Méthodes
Score de désaccord entre enseignants0,383
Score d'incertitude au seuil0,506

Scores Codex et Gemma par catégorie

CatégorieCodexGemma
Métarecherche0,0010,000
Méta-épidémiologie (sens strict)0,0000,000
Méta-épidémiologie (sens large)0,0000,000
Bibliométrie0,0000,001
Études des sciences et des technologies0,0000,000
Communication savante0,0000,000
Science ouverte0,0000,000
Intégrité de la recherche0,0000,000
Charge utile insuffisante (le modèle a refusé de juger)0,0000,000

Scores machine (provisoires)

Les deux têtes enseignantes du modèle étudiant, lues sur ce travail. Un score ordonne la base pour la relecture; il n'affirme jamais une catégorie, et le statut de validation accompagne chaque rangée tel quel.

Scores de référence d'un modèle non mature (critères de maturité non atteints, 7 itérations). Un score ordonne; il n'affirme jamais une catégorie.

Tête enseignante Opus0,027
Tête enseignante GPT0,283
Écart entre enseignants0,256 · la distance entre les deux têtes enseignantes sur ce seul travail
Statut de validationscore_only:v0-immature-baseline · tel quel depuis la passe de notation : score_only signifie que le nombre peut ordonner les travaux, et qu'aucune étiquette de catégorie n'en découle

Classification

machine, non validée

Prédiction automatique; un appel candidat d’une seule tête enseignante, pas un consensus.

Les modèles n’ont appliqué aucune catégorie : rien dans la taxonomie ne correspondait à ce travail.
Devis d'étudeSimulation ou modélisation
Domainenon disponible
GenreMéthodes

Le détail, modèle par modèle et score par score, se trouve en fin de page sous « Comment cette classification a été obtenue ».

En bref

Citations3
Publié2021
Routes d'admission1
Résumé présentoui

Explorer davantage

Même revueBrazilian Journal of Operations & Production ManagementMême sujetBIM and Construction IntegrationTravaux en français237 207