BIM-Integrated Simulation of Construction Operations for Lean Production Management
Notice bibliographique
Résumé
As construction projects become larger and more complex, traditional construction planning and control practice which relies on historical data and heuristic adjustment can no longer produce a plan that incorporates all the managerial details such as productivity dynamics. In addition, the plan, more often than not, does not synchronize with the procurement schedule; as a result, the whole supply chain has failed to accomplish expected level of efficiency. In these regards, this paper presents a simulation framework that can not only predict productivity dynamics by considering factors affecting on productivity at the operational level, but also automatically generate a procurement plan harmonizing with the simulation results for reliable production management. We developed APIs for the framework 1) enabling a BIM model to produce input data for the construction operation simulation; 2) composing construction simulation in operational level; 3) facilitating the productivity prediction by providing BIMintegrated construction simulation models. The simulation framework had tested with structural steel erection cases. The results show that we can expect significant improvement of efficiency along supply chain including optimized resource allocation, schedule reliability increase, storage cost saving, and material loss reduction.
Récupéré en direct depuis OpenAlex et désinversé. Les résumés ne sont pas conservés dans cette base de données : les index inversés représentent 8,6 Go des 9,3 Go de texte de la base, et le serveur dispose de 13 Go libres.
Comment cette classification a été obtenuedéplier
Prédiction distillée sur la base complète
Imitation des enseignantsNi prévalence calibrée, ni vérité terrain. Validation humaine à venir. Apprise à partir de 10 348 étiquettes directes de Codex et de 10 348 étiquettes directes de Gemma. Le mode candidate est l'union des têtes enseignantes seuillées; le consensus est leur intersection. Ces sorties portent le statut machine_predicted_unvalidated et ne sont ni des étiquettes humaines ni des étiquettes directes de modèles de pointe.
Scores Codex et Gemma par catégorie
| Catégorie | Codex | Gemma |
|---|---|---|
| Métarecherche | 0,000 | 0,000 |
| Méta-épidémiologie (sens strict) | 0,000 | 0,000 |
| Méta-épidémiologie (sens large) | 0,000 | 0,000 |
| Bibliométrie | 0,000 | 0,001 |
| Études des sciences et des technologies | 0,000 | 0,000 |
| Communication savante | 0,000 | 0,001 |
| Science ouverte | 0,000 | 0,000 |
| Intégrité de la recherche | 0,000 | 0,000 |
| Charge utile insuffisante (le modèle a refusé de juger) | 0,000 | 0,000 |
Scores machine (provisoires)
Les deux têtes enseignantes du modèle étudiant, lues sur ce travail. Un score ordonne la base pour la relecture; il n'affirme jamais une catégorie, et le statut de validation accompagne chaque rangée tel quel.
Scores de référence d'un modèle non mature (critères de maturité non atteints, 7 itérations). Un score ordonne; il n'affirme jamais une catégorie.
score_only:v0-immature-baseline · tel quel depuis la passe de notation : score_only signifie que le nombre peut ordonner les travaux, et qu'aucune étiquette de catégorie n'en découleClassification
machine, non validéePrédiction automatique; un appel candidat d’une seule tête enseignante, pas un consensus.
Le détail, modèle par modèle et score par score, se trouve en fin de page sous « Comment cette classification a été obtenue ».