Notice bibliographique
Résumé
On April 8 2012, Winnipeg's first rapid transit facility opened for service. Constructed during 2009-2011, this initial stage of the Southwest Transitway includes a 3.6 km grade-separated busway, three highly-developed stations, a tunnel beneath the CN main line, a bridge over a major arterial roadway, and active transportation facilities. The rapid transit routes use the transitway in combination with other transit priority measures and real-time passenger information systems to provide service that is fast, reliable, comfortable, and convenient. Project funding approval in 2008 included a commitment to complete construction of this $138 million project by the end of 2011. With preliminary design only partially completed at the time of funding approval, a condensed schedule for final design and construction was developed. To achieve the construction target, the following major elements of the project were tendered separately: 3.6 km of transitway runningway; 2.5 km of land drainage sewer; A 350 m transitway tunnel underpass of seven CN tracks; A land drainage pump station for the tunnel underpass; A 100 m overpass of a major arterial road; Three new transitway stations; Overall project signage, streetscaping, aesthetics and landscaping. The technical paper discusses how the challenging features of site, location, and construction conditions influenced implementation strategy, and how a unique mix of design ingenuity, technology, and equipment were used to successfully complete the project faster, and safer. For the covering abstract of this conference see ITRD record control number 201310RT334E.
Récupéré en direct depuis OpenAlex et désinversé. Les résumés ne sont pas conservés dans cette base de données : les index inversés représentent 8,6 Go des 9,3 Go de texte de la base, et le serveur dispose de 13 Go libres.
Comment cette classification a été obtenuedéplier
Prédiction distillée sur la base complète
Imitation des enseignantsNi prévalence calibrée, ni vérité terrain. Validation humaine à venir. Apprise à partir de 10 348 étiquettes directes de Codex et de 10 348 étiquettes directes de Gemma. Le mode candidate est l'union des têtes enseignantes seuillées; le consensus est leur intersection. Ces sorties portent le statut machine_predicted_unvalidated et ne sont ni des étiquettes humaines ni des étiquettes directes de modèles de pointe.
Scores Codex et Gemma par catégorie
| Catégorie | Codex | Gemma |
|---|---|---|
| Métarecherche | 0,000 | 0,000 |
| Méta-épidémiologie (sens strict) | 0,000 | 0,000 |
| Méta-épidémiologie (sens large) | 0,000 | 0,000 |
| Bibliométrie | 0,000 | 0,000 |
| Études des sciences et des technologies | 0,000 | 0,000 |
| Communication savante | 0,000 | 0,001 |
| Science ouverte | 0,000 | 0,000 |
| Intégrité de la recherche | 0,000 | 0,000 |
| Charge utile insuffisante (le modèle a refusé de juger) | 0,002 | 0,000 |
Scores machine (provisoires)
Les deux têtes enseignantes du modèle étudiant, lues sur ce travail. Un score ordonne la base pour la relecture; il n'affirme jamais une catégorie, et le statut de validation accompagne chaque rangée tel quel.
Scores de référence d'un modèle non mature (critères de maturité non atteints, 7 itérations). Un score ordonne; il n'affirme jamais une catégorie.
score_only:v0-immature-baseline · tel quel depuis la passe de notation : score_only signifie que le nombre peut ordonner les travaux, et qu'aucune étiquette de catégorie n'en découleClassification
machine, non validéePrédiction automatique; un appel candidat d’une seule tête enseignante, pas un consensus.
Le détail, modèle par modèle et score par score, se trouve en fin de page sous « Comment cette classification a été obtenue ».