MétaCan
Menu
Back to cohort
Record W1582406628

Organizing a Wartime Shipyard: The Union Struggle for a Closed Shop at West Coast Shipbuilders Limited 1941–44

2010· article· en· W1582406628 on OpenAlexaffvenueabout
Chris Madsen

Bibliographic record

VenueLabour / Le Travail · 2010
Typearticle
Languageen
FieldSocial Sciences
TopicLabor Movements and Unions
Canadian institutionsCanadian Forces CollegeRoyal Military College of Canada
Fundersnot available
KeywordsShipyardConciliationNegotiationShipbuildingSpanish Civil WarPolitical scienceWorld War IIEconomic historyEconomyLawArbitrationManagementHistoryArchaeologyEconomics
DOInot available

Abstract

fetched live from OpenAlex

During World War II thousands of workers entered the employ of wartime shipyards in British Columbia. Most Vancouver-area shipyards, following general practice in the United States along the Pacific Coast, operated on the basis of a closed shop, whereby membership was required in recognized labour unions holding agreements with the companies. Management at one shipyard, West Coast Shipbuilders Company Limited, however, bucked this trend and maintained an open shop in the face of growing pressure by the unions, in particular the marine boilermakers, to have a closed one. William McLaren, the main antagonist, reflected enduring older values among some employers in antithesis to labour-management cooperation prevalent in the United States and Canada in support of war production. Though the matter went to conciliation, the drawbacks of a legal approach were readily apparent when a board turned down labour’s request, and negotiations assisted by a judge resulted in adoption of a lesser maintenance of membership clause instead of the closed shop. Worker militancy and aggressive organizing, in the end, could not deliver the closed shop at West Coast Shipbuilders before war contracts concluded and shipbuilding contracted in the province. Taking a local, regional, and industry-specific perspective, this study argues that the union struggle for recognition and accommodation from employers in wartime Canada faltered in the case of obtaining a closed shop at this British Columbia wartime shipyard. Resume Pendant la Deuxieme Guerre mondiale, des milliers de travailleurs ont ete employes dans les chantiers navals en Colombie-Britannique. La plupart des chantiers navals dans la region de Vancouver, en suivant la pratique generale aux Etats-Unis tout au long de la cote du Pacifique, fonctionnaient a titre d’ateliers fermes, dans lesquels l’adhesion aux syndicats reconnus qui detenaient des ententes avec les entreprises etait obligatoire. La gestion a un chantier naval, West Coast Shipbuilders Company Limited, toutefois, a agi a contre-courant et a maintenu un atelier ouvert face a la pression croissante des syndicats, en particulier, les fabricants de chaudieres marines, pour en avoir un ferme. William McLaren, l’antagoniste principal, refletait des valeurs plus anciennes et durables parmi certains employeurs par opposition a la collaboration ouvriere patronale courante aux Etats-Unis et au Canada a l’appui de la production pour la guerre. Bien que l’affaire ait passe a la conciliation, les inconvenients d’une approche juridique etaient tres apparents quand une commission avait refuse la demande des syndicats, et les negociations assistees d’un juge avait donne lieu a l’adoption du maintien moindre d’une clause d’adhesion au lieu d’un atelier ferme. La militance des travailleurs et l’organisation agressive, au bout du compte, n’avait pas delivre l’atelier ferme aux chantiers navals de West Coast avant la fin des contrats pour la guerre et l’installation des chantiers navals dans la province. En prenant perspective locale, regionale et axee sur l’industrie, cette etude met en evidence l’argument que la lutte des syndicats pour la reconnaissance et l’accommodation des employeurs pendant la guerre au Canada a chancele dans le cas de l’obtention d’un atelier ferme a ces chantiers navals de Colombie-Britannique.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.001
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesScience and technology studies, Insufficient payload (model declined to judge)
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Not applicable · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.814
Threshold uncertainty score1.000

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0010.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.001
Science and technology studies0.0020.000
Scholarly communication0.0000.000
Open science0.0010.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0010.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.018
GPT teacher head0.262
Teacher spread0.244 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

Study designNot applicable
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations4
Published2010
Admission routes3
Has abstractyes

Explore more

Same venueLabour / Le TravailSame topicLabor Movements and UnionsFrench-language works237,207