MétaCan
Menu
Back to cohort
Record W1970959449 · doi:10.1179/aes.2001.110.2.88

Syerston nickel–cobalt–platinum project

2001· article· en· W1970959449 on OpenAlexaboutno aff
J. R. Askew

Bibliographic record

VenueApplied Earth Science Transactions of the Institutions of Mining and Metallurgy Section B · 2001
Typearticle
Languageen
FieldEngineering
TopicMining Techniques and Economics
Canadian institutionsnot available
Fundersnot available
KeywordsCobaltDebtCapital costBusinessStock exchangeFinanceEngineeringChemistry

Abstract

fetched live from OpenAlex

The Syerston project comprises the development, mining and processing of nickel, cobalt and platinum resources in the central-west region of New South Wales, Australia, some 400 km northwest of Sydney. Wholly operated by Black Range Minerals, Ltd. (listed on the Australian Stock Exchange), Syerston will be a significant force in the Australian cobalt industry, producing approximately 4000 t/year cobalt for 20 years. Nickel production is initially projected at 18 500 t/year at an operating cost of $U.S.(0.18)/lb after cobalt credits. Recovery of 10 000-15 000 oz/year by-product platinum by gravity and magnetic separation has not yet been factored into the project economics.A detailed bankable feasibility study, which was funded by a $Aus.10 000 000 facility provided by CIBC Capital Partners of Toronto, Canada, and completed in June, 2000, confirmed Syerston's robust technical and financial viability as the best of the second-generation laterite deposits using pressure acid-leach technology. The capital cost is projected at $Aus.629 000 000 (including refinery).The status of the project in November, 2000, was as follows. The company was engaged in parallel negotiations with major industry partners and major banks for project debt. Parties offering completion support and/or seeking offtake agreements for cobalt production had been invited to analyse the project feasibility data and negotiations were under way. A detailed environmental impact statement had been produced for public comment and no issues had emerged that might delay approval. Likewise, there were no native title issues that could curtail development. Following assessment of tenders for the engineering procurement and construction management, which had been submitted by many engineering groups, the expectation was that construction would commence in the second quarter of 2001, followed by starts of ore commissioning in mid-2003, ramp-up production at the end of 2003 and full production in mid-2005.Syerston has the advantage of learning from the first generation of Western Australian nickel laterite projects and is confident that the materials technologies, capital and maintenance cost issues and commissioning schedule lessons have been fully addressed; reviews of the project by industry third parties and banks since completion of the bankable feasibility study confirm this opinion.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Bench or experimental · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.370
Threshold uncertainty score0.367

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.001
Science and technology studies0.0000.001
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.027
GPT teacher head0.238
Teacher spread0.211 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designBench or experimental
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations2
Published2001
Admission routes1
Has abstractyes

Explore more

Same venueApplied Earth Science Transactions of the Institutions of Mining and Metallurgy Section BSame topicMining Techniques and EconomicsFrench-language works237,207