MétaCan
Menu
← Back to cohort
Record W1979324153 · doi:10.1061/41187(420)15

Observations from Several Condition Assessments of Prestressed Concrete Cylinder Pipe Used at Energy Generation Facilities

2011· article· en· W1979324153 on OpenAlexaff
Todd Stong, Ron Jorgenson, Jacob Sauer

Bibliographic record

Venuenot available
Typearticle
Languageen
FieldEngineering
TopicGeotechnical Engineering and Underground Structures
Canadian institutionsGolder Associates (Canada)
Fundersnot available
KeywordsWater coolingPipeline transportElectricity generationEnvironmental sciencePower stationWork (physics)Condenser (optics)EngineeringCivil engineeringMarine engineeringMechanical engineeringPower (physics)Environmental engineering

Abstract

fetched live from OpenAlex

Golder Associates Inc. has conducted several condition assessments of prestressed concrete cylinder pipe (PCCP) used in the cooling water systems of energy generation facilities. This paper presents observations from these condition assessment projects. A vital component to the operation of energy generation facilities is the cooling water system. The cooling water system conveys cool water from a river or basin through the plant's condensers to condense steam produced in the process of power generation. The heated water is then returned to the river or basin, or sent through cooling towers to dissipate the gained heat. To work effectively, these systems typically operate with high flows (greater than 200,000 gpm) and low pressures (less than 60 psi) in large diameter pipelines (typically 54 to 120 in). These systems may provide cooling water to one or more units, and redundancy is not typical. Thus, the isolation of these systems for evaluation or repair may require the temporary shutdown of one or several units, resulting in significant costs associated with purchasing replacement power. Many utilities operating energy generation facilities constructed in the 1970s and 1980s have not included these cooling water systems in their general plant evaluation and maintenance schedule, and these systems have often operated continuously for over 30 years. Due to the increased awareness of plant personnel, and the age of their buried infrastructure, these systems are now being evaluated. Condition assessment of these systems is similar to other pipelines with tasks such as document review, physical evaluation and condition summary, but also requires detailed planning to coincide with planned unit outages, and in some cases requires significant coordination with other facilities to allow for several unit outages at the same time. Pipeline condition assessments conducted have identified a wide range of conditions for the 30- to 40-year-old PCCP used in cooling water systems, ranging from pristine pipe, to pipe that has technically failed. Factors contributing to the distress observed in the pipelines include the manufacturing practices (particularly the use of class IV prestressing wire), installation practices, nearby stray electric currents, groundwater quality and interaction, and operational stresses. Recommendations from these condition assessments have also varied greatly, from continued evaluation, instituting operational controls, or even complete replacement of distressed portions of the line.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.001
metaresearch head score (Gemma)0.003
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Observational · Consensus signal: Observational
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.011
Threshold uncertainty score0.023

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0010.003
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0020.001
Science and technology studies0.0010.000
Scholarly communication0.0000.001
Open science0.0000.001
Research integrity0.0010.001
Insufficient payload (model declined to judge)0.0010.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.049
GPT teacher head0.225
Teacher spread0.176 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designObservational
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2011
Admission routes1
Has abstractyes

Explore more

Same topicGeotechnical Engineering and Underground Structures→French-language works237,207→