Case History: Automated Drilling Performance Measurement of Crews and Drilling Equipment

2009· article· en· W1989995922 on OpenAlexaff
Ketil Andersen, Per Arild Sjøwall, Eric Maidla, Buddy King, Gerhard Thonhauser, Philipp Zöllner

Bibliographic record

Venuenot available
Typearticle
Languageen
FieldEngineering
TopicDrilling and Well Engineering
Canadian institutionsNexen (Canada)
FundersStatoil
KeywordsDowntimeCrewTrippingCasingDrillingComputer scienceProcess (computing)Measurement while drillingReliability engineeringEngineeringReal-time computingMechanical engineeringAeronauticsOperating system

Abstract

fetched live from OpenAlex

Abstract This paper describes the development and implementation of a unique new capability to automatically measure the performance of drilling crews, drilling equipment and downtime. The methodology and supporting technology make it possible to carry out a detailed comparison of the performance of equipment and crews across a large number of installations. The system was tested on 8 drilling units (fixed and mobile) in the North Sea. When the data is analysed and plotted as a histogram (frequency against time taken for each task) the information provided gives: The management a process to select the best supplier based on the performance of its equipment when compared to the technical limit of that equipment.The crews the most consistent and efficient way of working (best practice).The management an automated measuring tool to set and follow up the targets for crew performance.A tool that makes ‘hidden down time’ visible, so appropriate actions can be taken to improve performance.A process to see if operations can be eliminated or considerably reduced in time (reaming, circulating, etc). When it comes to crew handling of the equipment the results show a performance improvement of 30%. There are potential time savings of between 40 to 60% in some individual drilling tasks such as slip to slip connection times and weight to weight connection times. This is achieved by performing each operation in a more efficient and consistent way. Optimizing a number of identified KPIs for drilling, including tripping and casing running times, shows a potential saving of between 8 to 15% of the total well construction time. Automated Drilling Performance Measurement (ADPM) has been proven in over 30 wells on 8 rigs in the North Sea. This paper also describes the implementation strategy and approach including the elements of the change management and training that are required to implement this new drilling performance process.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Simulation or modeling · Consensus signal: Simulation or modeling
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.057
Threshold uncertainty score0.729

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.023
GPT teacher head0.187
Teacher spread0.164 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designSimulation or modeling
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations29
Published2009
Admission routes1
Has abstractyes

Explore more

Same topicDrilling and Well EngineeringFrench-language works237,207