MétaCan
Menu
Back to cohort
Record W1998922408 · doi:10.3846/jcem.2010.60

CAUSES OF VARIATION ORDERS IN CONSTRUCTION PROJECTS IN THE GAZA STRIP

2010· article· en· W1998922408 on OpenAlexaff
Adnan Enshassi, Faisal Manzoor Arain, Sadi Al-Raee

Bibliographic record

VenueJournal of Civil Engineering and Management · 2010
Typearticle
Languageen
FieldDecision Sciences
TopicConstruction Project Management and Performance
Canadian institutionsSAIT Polytechnic
Fundersnot available
KeywordsVariation (astronomy)Spare partRanking (information retrieval)Gaza stripClosure (psychology)Quality (philosophy)Process (computing)BusinessOperations managementOrder (exchange)MarketingEngineeringComputer scienceFinancePolitical sciencePalestine

Abstract

fetched live from OpenAlex

The maximum project performance would be achieved if the work invariably flows smoothly within time limits and anticipated budget. Variation orders result in time delay, cost overrun, quality defects, and other negative impacts. This is common in construction projects in Gaza Strip. The main objective of this study was to analyze the causes of variation orders in construction projects in Gaza Strip. The causes of variation orders in construction process in Gaza Strip were investigated through questionnaire survey of 36 classified construction companies, 25 consultants and 15 owners. 64 causes of variation orders were identified from literature review. The study results identified the top ten most important factors that include lack of materials and equipment spare parts due to closure, change in design by consultant, lack of consultant's knowledge of available materials, errors and omission in design, conflicts between contract documents, owner's financial problems, lack of coordination among project parties, using inadequate specification for local markets by international consultant, internal politics, and change is specification by owners. In general, the study shows an agreement among owners, consultants and contractors regarding the ranking of the 64 factors causing variation orders. The results al‐so reveal that factors related to consultant are the most important causes of variation orders followed by the factors related to owner. An understanding of the causes of variation orders would be helpful for building professionals in assessing variation orders. Furthermore, the study would also assist professionals in taking proactive measures for reducing variation orders in construction projects. The findings from this study would also be valuable for all construction professionals in general. Santrauka Projektas bus efektyviausias, jei darbai vyks nuolatos ir sklandžiai, neviršijant terminu ir numatyto biudžeto. Del pake‐itimu nurodymu projektas užtrunka, viršijamos sanaudos, atsiranda kokybes trūkumu ir patiriamas kitoks neigiamas poveikis. Tai būdinga Gazos ruože vykstantiems statybu projektams. Pagrindinis šio tyrimo tikslas – išanalizuoti, kokios priežastys Gazos ruožo statybu projektuose lemia pakeitimu nurodymus. Priežastys, lemiančios pakeitimu nurodymus Gazos ruožo statybu procese, buvo tiriamos atlikus 36 tam tikros kategorijos statybos imoniu, 25 konsultantu ir 15 savininku apklausa. Apžvelgus literatūra nustatytos 64 pakeitimu nurodymus lemiančios priežastys. Atlikus tyrima, buvo nustatyti dešimt svarbiausiu veiksniu, iskaitant medžiagu ir atsarginiu irangos daliu trūkuma del uždarymo, projekto konsultanto pakeitimus, nepakankamas konsultanto žinias apie galimas medžiagas, projekto klaidas ir trūkumus, vienas kitam prieštaraujančius sutarties dokumentus, finansines savininko problemas, veiksmu koordinavimo trūkuma tarp projekto dalyviu, tarptautinio konsultanto naudojamas vietiniu rinku neatitinkančias specifikacijas, vidaus politika ir savininku pakeitimus specifikacijoje. Apskritai tyrimas rodo, kad savininkai, konsultantai ir rangovai sutaria del to, kaip pagal svarba išsidesto 64 veiksniai, lemiantys pakeitimu nurodymus. Be to, rezultatai rodo, kad su konsultantu susije veiksniai yra svarbiausios pakeitimu nurodymu priežastys, o antroje vietoje – su savininku susije veiksniai. Statybu specialistams suprantant, kokios priežastys lemia pakeitimu nurodymus, tokius nurodymus jiems vertinti būtu lengviau. Be to, tyrimas padetu specialistams imtis aktyviu priemoniu, kad statybu projektuose pakeitimu nurodymu būtu mažiau. Šio tyrimo išvados taip pat būtu naudingos visiems statybu specialistams apskritai.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.002
metaresearch head score (Gemma)0.005
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Observational · Consensus signal: Observational
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.018
Threshold uncertainty score0.036

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0020.005
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0030.004
Science and technology studies0.0020.001
Scholarly communication0.0020.001
Open science0.0010.001
Research integrity0.0010.001
Insufficient payload (model declined to judge)0.0030.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.026
GPT teacher head0.281
Teacher spread0.255 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designObservational
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations72
Published2010
Admission routes1
Has abstractyes

Explore more

Same venueJournal of Civil Engineering and ManagementSame topicConstruction Project Management and PerformanceFrench-language works237,207