Bibliographic record
Abstract
The North Hollywood Project is a 10 km twin tunnel extension to the Los Angeles Metro Red Line valued at US$1·3 billion. The extension includes three stations constructed by cut and cover methods, together with the rail track, the necessary support systems, and rolling stock. This paper covers the main civil engineering construction of the project. The construction of the cut and cover stations is described. A number of interesting features of the tunnel construction are described, including the boring of the main running tunnels using tunnel boring machines (TBMs), the construction of a special seismic section of oversize tunnel through a major fault using shotcrete lining, track level rooms, starter tunnels and cross passages between running tunnels. An important emphasis of the paper is on the rock tunnels driven by the TBMs. The difficulties caused by severe geological conditions include dealing with water at high pressure and fissure grouting to reduce water inflow through the permanent lining. Both the temporary and the permanent tunnel lining are described.
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
How this classification was reachedexpand
Full frame distilled prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.
Codex and Gemma teacher scores by category
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.000 | 0.000 |
| Meta-epidemiology (narrow) | 0.000 | 0.000 |
| Meta-epidemiology (broad) | 0.000 | 0.000 |
| Bibliometrics | 0.000 | 0.001 |
| Science and technology studies | 0.000 | 0.000 |
| Scholarly communication | 0.000 | 0.000 |
| Open science | 0.000 | 0.000 |
| Research integrity | 0.000 | 0.000 |
| Insufficient payload (model declined to judge) | 0.000 | 0.000 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from itClassification
machine, unvalidatedMachine predicted; a candidate call from one teacher head, not a consensus.
How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".