MétaCan
Menu
Back to cohort
Record W2015097383 · doi:10.3846/13923730.2012.699914

DATA PREPROCESSING FOR ARTIFICIAL NEURAL NETWORK APPLICATIONS IN PRIORITIZING RAILROAD PROJECTS – A PRACTICAL EXPERIENCE IN TAIWAN

2012· article· en· W2015097383 on OpenAlexaff
Min–Yuan Cheng, Chengwei Su, Ming‐Hsiu Tsai, Kuo‐Sin Lin

Bibliographic record

VenueJournal of Civil Engineering and Management · 2012
Typearticle
Languageen
FieldEngineering
TopicInfrastructure Maintenance and Monitoring
Canadian institutionsMinistry of Transportation of Ontario
Fundersnot available
KeywordsAnalytic hierarchy processRanking (information retrieval)Computer scienceArtificial neural networkConsistency (knowledge bases)PreprocessorOperations researchArtificial intelligenceData miningEngineering

Abstract

fetched live from OpenAlex

Financial constraints necessitate the tradeoff among proposed railroad projects, so that the project priorities for implementation and budget allocation need to be determined by the ranking mechanisms in the government. At present, the Taiwan central government prioritizes funding allocations primarily using the analytic hierarchy process (AHP), a methodology that permits the synthesizing of subjective judgments systematically and logically into objective consensus. However, due to the coopetition and heterogeneity of railway projects, the proper priorities of railroad projects could not be always evaluated by the AHP. The decision makers prefer subjective judgments to referring to the AHP evaluation results. This circumstance not only decreased the AHP advantages, but also raised the risk of the policies. A method to consider both objective measures and subjective judgments of project attributes can help reduce this problem. Accordingly, combining the AHP with the artificial neural network (ANN) methodologies would theoretically be a proper solution to bring a ranking predication model by creating the obscure relations between objective measures by the AHP and subjective judgments. However, the inconsistency between the AHP evaluation and subjective judgments resulted in the inferior soundness of the AHP/ANN ranking forecast model. To overcome this problem, this study proposes the data preprocessing method (DPM) to calculate the correlation coefficient value using the subjective and objective ranking incidence matrixes; according to the correlation coefficient value, the consistency between the AHP rankings and subjective judgments of railroad projects can be evaluated and improved, so that the forecast accuracy of the AHP/ANN ranking forecast model can also be enhanced. Based on this concept, a practical railroad project ranking experience derived from the Institute of Transportation of Taiwan is illustrated in this paper to reveal the feasibility of applying the DPM to the AHP/ANN ranking prediction model.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.003
metaresearch head score (Gemma)0.006
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Simulation or modeling · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.020
Threshold uncertainty score0.039

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0030.006
Meta-epidemiology (narrow)0.0010.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0010.002
Science and technology studies0.0010.000
Scholarly communication0.0010.001
Open science0.0010.001
Research integrity0.0000.001
Insufficient payload (model declined to judge)0.0010.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.040
GPT teacher head0.305
Teacher spread0.265 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designSimulation or modeling
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations8
Published2012
Admission routes1
Has abstractyes

Explore more

Same venueJournal of Civil Engineering and ManagementSame topicInfrastructure Maintenance and MonitoringFrench-language works237,207