MétaCan
Menu
Back to cohort
Record W2030559725 · doi:10.1115/ipg2013-1942

A Proposed Geotechnical Risks Management Plan for Pipeline Integrity

2013· article· en· W2030559725 on OpenAlexaboutno aff
Hudson Régis Oliveira

Bibliographic record

Venuenot available
Typearticle
Languageen
FieldEngineering
TopicStructural Integrity and Reliability Analysis
Canadian institutionsnot available
FundersUniversidade Federal de Santa Catarina
KeywordsPipeline transportIntegrity managementEngineeringPlan (archaeology)Pipeline (software)Identification (biology)Risk managementCivil engineeringGeotechnical investigationRisk analysis (engineering)Construction engineeringForensic engineeringGeotechnical engineeringGeologyMechanical engineering

Abstract

fetched live from OpenAlex

Linear works, such as highways, power lines, gas and oil pipelines among others, as well as other types of engineering works can be threaten by natural hazards, such as landslides, floods, erosions, earthquakes, hurricanes, seaquakes and others, which could lead to great environmental impacts, very high sum of money lost and even deaths. Aiming to reduce geological and geotechnical risks, preventive or corrective actions can be executed from the design phase to the operational and maintenance stages in pipelines. In this last phase, an integrity management plan of these facilities can be adopted, with the purpose of mitigating residual risks that had not been covered on the design and construction phases. One of the alternatives to implement an integrity management of gas pipelines is found in the code “Managing System Integrity of Gas Pipelines” – ASME B31.8S (2005). However, this code has some limitations in actions concerning to prevention, identification and correction of geological and geotechnical problems. This paper presents information about geotechnical risks in transmission pipelines and tools applied in identification, prevention and correction of geotechnical problems in pipelines, as well as, others with potential to be applied in pipelines. A basic pipeline integrity management plan focused in geotechnical risks is proposed in the paper, transcribed as a contribution to ASME B31.8S Code. This plan is composed by actions: from identification, prevention, evaluation and analysis to correction of geotechnical instabilities in pipelines. The plan is composed by a flowchart with all actions selected for the geotechnical risk care. The plan was developed based on directions set in ASME B31.8S Code, together with Brazilian, Italian and Canadian experiences.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.003
metaresearch head score (Gemma)0.003
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Theoretical or conceptual · Consensus signal: none
GenreCandidate signal: Methods · Consensus signal: Methods
Teacher disagreement score0.011
Threshold uncertainty score0.035

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0030.003
Meta-epidemiology (narrow)0.0010.000
Meta-epidemiology (broad)0.0000.001
Bibliometrics0.0020.001
Science and technology studies0.0010.001
Scholarly communication0.0030.003
Open science0.0020.002
Research integrity0.0020.001
Insufficient payload (model declined to judge)0.0100.003

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.035
GPT teacher head0.267
Teacher spread0.232 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designTheoretical or conceptual
Domainnot available
GenreMethods

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2013
Admission routes1
Has abstractyes

Explore more

Same topicStructural Integrity and Reliability AnalysisFrench-language works237,207