MétaCan
Menu
Back to cohort
Record W2030624679 · doi:10.1061/40766(174)50

Open-Standards Radio Based Train Control Proven for APMs

2005· article· en· W2030624679 on OpenAlexaff
David M. Dimmer

Bibliographic record

Venuenot available
Typearticle
Languageen
FieldEngineering
TopicRailway Systems and Energy Efficiency
Canadian institutionsTransport Canada
Fundersnot available
KeywordsBandwidth (computing)MonorailComputer scienceControl systemTrainEngineeringTelecommunicationsComputer networkElectrical engineering

Abstract

fetched live from OpenAlex

With the opening of the Las Vegas Monorail, the first installation of an open standards based radio train control system is in operation. The architecture of the Las Vegas Monorail train control system will be presented, and the numerous benefits of this type of system as compared to conventional track circuit or inductive loop based control systems will be examined with an emphasis on flexibility, and cost reduction. Using the IEEE 802.3 open standard for LAN based communication, and the IEEE 802.11 standard for the wayside to carborne link, the installation in Las Vegas has proven the viability and benefits of basing a train control system on open standards. An analysis of the success of the first six months of operation will be presented. By specifying an IEEE 802.3 standard interface between the train control subsystems and the communication system and using the Internet Protocol as the basis for all messaging, the layered architecture of the train control system eliminates its dependence upon a specific radio technology. The benefits of this concept will be examined. The IEEE 802.11 radios in use today provide a significantly expanded communication bandwidth, as compared to previous generation APM control systems. The benefits this added bandwidth brings to train control applications will be examined. In addition, an analysis will be made of the available unused bandwidth in the train control network for other applications such as carborne and remote wayside CCTV, enhanced diagnostics, and passenger announcement applications. Additional APM projects under development, which are using this technology will be discussed, with an analysis of their differences from the Las Vegas monorail.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.001
metaresearch head score (Gemma)0.002
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Bench or experimental · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: none
Teacher disagreement score0.015
Threshold uncertainty score0.051

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0010.002
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0010.001
Science and technology studies0.0010.001
Scholarly communication0.0030.003
Open science0.0010.002
Research integrity0.0010.001
Insufficient payload (model declined to judge)0.0150.004

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.008
GPT teacher head0.233
Teacher spread0.225 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designBench or experimental
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2005
Admission routes1
Has abstractyes

Explore more

Same topicRailway Systems and Energy EfficiencyFrench-language works237,207