MétaCan
Menu
Back to cohort
Record W2036200005 · doi:10.2118/102241-ms

Coiled-Tubing Perforation and Zonal Isolation in Harsh Wellbore Conditions

2006· article· en· W2036200005 on OpenAlexaff
Muhammad Omar, Asmadi Ali, Zulfiqar Ali, Arthur Parapat, William Speck, E. Parta

Bibliographic record

VenueSPE Annual Technical Conference and Exhibition · 2006
Typearticle
Languageen
FieldEngineering
TopicOil and Gas Production Techniques
Canadian institutionsSchlumberger (Canada)
Fundersnot available
KeywordsCoiled tubingPerforationCompletion (oil and gas wells)Petroleum engineeringInfillWellboreWorkoverIsolation (microbiology)EngineeringMarine engineeringStructural engineeringMechanical engineering

Abstract

fetched live from OpenAlex

Abstract Coiled tubing has been widely used worldwide to perform perforating and zonal isolation operation due to the ability in intervening highly deviated and long section of horizontal wells under live condition, where slickline and E-line have difficulties. This paper presents case history of coiled tubing perforating and zonal isolation evolution in infill well at Resak field, one of the gas field operated by Malaysia National E&P Company, Petronas Carigali Sdn Bhd. Since the beginning of Resak Field production, coiled tubing has been used to perforate numbers of infill wells with low success ratio. The reservoir characteristics with high formation pressure and BHT followed by high CO2, H2S production and improper well clean up contributed in the increase of operational risks and challenges. Several failures reported in the past was carefully analyzed to determine the actual root cause prior to coming up with the proper job design and operational procedures. CTU with 1.5" CT reel was used to convey 140 ft of 2-7/8" gun due to crane and platform deck loading limitation. The small CT size and large gun conveyance required extra precaution since the presence of gun shock during perforation may affect the CT integrity. Therefore supporting perforating software was run in advanced to optimize gun selection where both operational risks and production objectives were taken into consideration. Coiled tubing forces simulation was also used to determine the ability of the gun assemblies to be safely conveyed into the target sands. In addition to that, one of the unique features from the gun assemblies was the selection of electronic firing head over a conventional or standard drop ball mechanism. This tool utilized coded sequence created from variation of surface pump rate to generate its firing command, providing reliable gun activation where as the drop ball mechanism in the past was found to have some operational difficulties. Lastly, this paper also mentions the proper selection of zonal isolation method that can withstand the wellbore condition, providing adequate isolation whilst able to be retrieved for future production requirements. The result of those engineering studies managed to overcome the operational failures in the past and at the same time was able to meet the production objective. Project Result After performing the coiled tubing operation by isolating J10.2 with inflatable bridge plug and perforating J10.1 with deep penetration gun, the well managed to be produced at 22.7 MMSCF/D & stabilized at 48 MMCSF/D (23 % choke size) with total gain of 41MMSCF/D which was higher than the expected gain of 35 MMSCF/day (Figure 1). Currently the well is the highest producing well in Resak field with stable production at 49.8 MMSCCF/D. Figure 1Production Data before and After CT Perforating

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Bench or experimental · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.402
Threshold uncertainty score0.477

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0000.000
Scholarly communication0.0000.001
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.009
GPT teacher head0.225
Teacher spread0.217 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designBench or experimental
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations7
Published2006
Admission routes1
Has abstractyes

Explore more

Same venueSPE Annual Technical Conference and ExhibitionSame topicOil and Gas Production TechniquesFrench-language works237,207