MétaCan
Menu
Back to cohort
Record W2053968444 · doi:10.1139/l02-106

Results of a pilot study to examine the effective integration of apprentices into the industrial construction sector

2003· article· en· W2053968444 on OpenAlexvenueaboutno aff
Aminah Robinson Fayek, Ahmed A. Shaheen, Ayo Oduba

Bibliographic record

VenueCanadian Journal of Civil Engineering · 2003
Typearticle
Languageen
FieldEngineering
TopicMining Techniques and Economics
Canadian institutionsnot available
Fundersnot available
KeywordsApprenticeshipEconomic shortageSecondary sector of the economyBest practiceEngineeringBusinessOperations managementManagementEconomics

Abstract

fetched live from OpenAlex

The industrial construction sector in Alberta has recently undergone a period of rapid growth, resulting in a shortage of skilled workers in almost all of the major industrial sector trades. To meet these shortages, a need has arisen to increase the utilization of apprentices on industrial construction projects. In an effort to address this issue, the Construction Owners Association of Alberta has established a goal of developing an industry Best Practice on how to improve the on-the-job portion of apprenticeship training and identify means by which the industry can more effectively use apprentices. The challenge is to increase their usage in a cost-effective manner that also provides apprentices with adequate training opportunities. Before this can be done, the impacts and benefits to the various parties involved in industrial construction must be quantified and assessed. This paper describes the findings of a pilot study that was conducted on a major industrial project to help in quantifying the impact of the use of apprentices in the industrial construction sector and to identify methods of effectively increasing their use while simultaneously enhancing their on-the-job learning experience. The main conclusion of this paper is that apprentices can be effectively incorporated in industrial construction, and they can be both productive and cost-effective, provided they are given adequate instruction and supervision. The lessons learned from the study are discussed to provide insight into conducting future studies. Recommendations for an industry Best Practice on the effective utilization of apprentices are presented.Key words: apprentice, electrician, industrial construction, journeyman, labour force, pipefitter, productivity, training, work sampling.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.007
metaresearch head score (Gemma)0.015
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Observational · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.992
Threshold uncertainty score0.039

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0070.015
Meta-epidemiology (narrow)0.0010.001
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0010.000
Science and technology studies0.0020.001
Scholarly communication0.0010.001
Open science0.0010.001
Research integrity0.0010.001
Insufficient payload (model declined to judge)0.0040.001

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.022
GPT teacher head0.199
Teacher spread0.178 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designObservational
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations13
Published2003
Admission routes2
Has abstractyes

Explore more

Same venueCanadian Journal of Civil EngineeringSame topicMining Techniques and EconomicsFrench-language works237,207