Record W2057909825 · doi:10.1115/es2008-54216

Design of a 200 kWe Solar Thermal Power Plant for Ontario

2008· article· en· W2057909825 on OpenAlexaffabout
Thomas Cooper, James S. Wallace

Bibliographic record

Venuenot available
Typearticle
Languageen
FieldEnergy
TopicSolar Thermal and Photovoltaic Systems
Canadian institutionsUniversity of Toronto
Fundersnot available
KeywordsEnvironmental sciencePower stationThermal energy storageSolar energySolar powerEngineeringPower (physics)MeteorologyElectrical engineeringProcess engineeringGeography

Abstract

fetched live from OpenAlex

A preliminary design and feasibility study has been conducted for a 200 kWe solar thermal power plant for operation in Ontario. The objective of this study is to assess the feasibility of small-scale commercial solar thermal power production in areas of relatively low insolation. The design has been developed for a convention centre site in Toronto, Ontario. The plant utilizes a portion of the large flat roof area of the convention centre to accommodate the collector array. Each power plant module provides a constant electrical output of 200 kWe throughout the year. The system is capable of maintaining the constant output during periods of low insolation, including night-time hours and cloudy periods, through a combination of thermal storage and a supplemental natural gas heat source. The powerplant utilized the organic Ranking cycle (ORC) to allow for relatively low source temperatures from the solar collector array. A computer simulation model was developed to determine the performance of the system year-round using the utilizability-solar fraction method. The ORC powerplant uses R245fa as the working fluid and operates at an overall efficiency of 11.1%. The collector is a non-concentrating evacuated tube type and operates at a temperature of 90°C with an average annual efficiency of 23.9%. The system is capable of achieving annual solar fractions of 0.686 to 0.874 with collector array areas ranging from 30 000 to 40 000 m2 and storage tank sizes ranging from 3.8 to 10 × 106L respectively. The lowest possible cost of producing electricity from the system is $0.393 CAD/kWh. The results of the study suggest that small-scale solar thermal plants are physically viable for year round operation in Ontario. The proposed system may be economically feasible given Ontario’s fixed purchase price of $0.42 CAD/kWh, but the cost of producing electricity from the system is highly dependent on the price of the solar collector.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Theoretical or conceptual · Consensus signal: none
GenreCandidate signal: Methods · Consensus signal: none
Teacher disagreement score0.823
Threshold uncertainty score0.352

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0010.000
Scholarly communication0.0010.000
Open science0.0010.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0080.001

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.046
GPT teacher head0.213
Teacher spread0.167 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designTheoretical or conceptual
Domainnot available
GenreMethods

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2008
Admission routes2
Has abstractyes

Explore more

Same topicSolar Thermal and Photovoltaic SystemsFrench-language works237,207