Radio frequency additional heating systems issues for the TORE-SUPRA WEST project
Bibliographic record
Abstract
This year TORE-SUPRA celebrated its 25 years of operation. During this long time a number of technologies have been developed [1]. First of all it was mandatory to develop reliable superconducting magnets at ~ - 4 K, with superfluid helium as efficient coolant. For the production of steady state discharge, 3 types of Radio Frequency (RF) additional heating systems have been developed: Lower Hybrid Current Drive (LHCD), Ion Cyclotron Resonance Heating (ICRH) and Electron Cyclotron Resonance Heating (ECRH) [2]. To cope with long lasting discharges (up to 380 s × 2.8 MW) and large RF additional heating power (12.3 MW × 3 s), Actively Cooled (AC) Plasma Facing Components (PFC) were deployed in TORE-SUPRA for the first time in a Tokamak environment. TORE-SUPRA is now being modified into an axisymmetric tokamak with actively cooled tungsten main chamber walls and a divertor, the WEST project (W - for tungsten - Environment in Steady-state Tokamak) [3]. This new facility has the objective to offer ITER a test bed for validating the relevant actively cooled metallic technologies in D-shape H-mode plasmas. In contrast to other metallic devices such as JET and ASDEX, WEST will rely only on RF additional power systems. A set of plasma scenarios have been identified, ranging from a high total RF power scenario up to 15 MW during 30 seconds, to a high fluence scenario of 1000 seconds with up to 10 MW of injected RF power. These scenarios are able to reproduce ITER relevant conditions of steady state heat loads of 10 to 20 MW/m2, to test tungsten actively cooled divertor technologies with relevant power heat fluxes and particle fluence. The paper presents the main issues regarding WEST project and especially the additional RF power injection systems (2 LHCD antennas, 3 + 4 = 7 MW continuous wave and 3 ICRH antennas, 3 × 3 = 9 MW-30 s or 3 MW-1000 s) for WEST. The front face of the LHCD antennas will be modified to account for the different plasma position and smaller toroidal field ripple, due to the more inward antenna position in the vessel. No other modifications are needed on the Passive-Active Multijunction (PAM) or the Fully-Active Multijunction (FAM) LHCD antennas, or the associated generator (2 × 8 klystrons, 600 kW each CW). Concerning the ICRH system, the main challenges are its ELM-resilience, its compatibility with continuous operation, and the interaction of the RF near fields with neighbouring plasma facing components. 3 new actively cooled antennas are being designed to be matched with an ELMs resilient electric circuit. The proposed solution is based on the JET-EP antenna and CEA prototype tested in 2007, both having identical internal conjugate-T electrical layout and a demonstrated load resilience capacity to plasma edge transients during ELMs.
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
How this classification was reachedexpand
Full frame machine prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.
Distilled classifier scores by category (both heads)
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.004 | 0.002 |
| Meta-epidemiology (narrow) | 0.001 | 0.000 |
| Meta-epidemiology (broad) | 0.000 | 0.000 |
| Bibliometrics | 0.000 | 0.000 |
| Science and technology studies | 0.001 | 0.000 |
| Scholarly communication | 0.002 | 0.003 |
| Open science | 0.001 | 0.001 |
| Research integrity | 0.001 | 0.002 |
| Insufficient payload (model declined to judge) | 0.010 | 0.005 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from itClassification
machine, unvalidatedMachine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.
How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".