Record W2068423092 · doi:10.1115/ipc2014-33096

When HDD Construction Shifts Happen: Insertion of a Casing Sleeve Mitigated a Major Threat to Completion of the Project

2014· article· en· W2068423092 on OpenAlexaboutno aff
G. Arthur Kanzaki, Stephen Grant, Jarrod R. MacKenzie

Bibliographic record

Venuenot available
Typearticle
Languageen
FieldEngineering
TopicDrilling and Well Engineering
Canadian institutionsnot available
Fundersnot available
KeywordsDirectional drillingCompletion (oil and gas wells)CasingUpgradeDrillingDrillBoreholePipeline (software)EngineeringPipeline transportMarine engineeringComputer scienceGeotechnical engineeringMechanical engineering

Abstract

fetched live from OpenAlex

This paper will discuss how the project team planned, designed and constructed a unique and innovative casing sleeve as one of the key solutions to overcome a major threat to the completion of a horizontal directional drilling (“HDD”) project (“Fraser River South Arm Crossing Upgrade Project” or “Fraser River Crossing”). In 2009 FortisBC Energy Inc. (“FortisBC”) started construction to upgrade its NPS 20 and NPS 24 pipeline crossings of the Fraser River, the largest river in the province of BC, Canada via HDD. Due to the poor surface geology at this location on the Fraser River, temporary surface casings were required on both sides of the crossing to get drilling activities into a formation suitable for conducting an HDD crossing. As a result, the Fraser River Crossing required an HDD rig to drill concurrently from either side of the crossing in order to create a continuous borehole (also known as an intersect crossing). During the pullback of the NPS 24 - 1.35 km crossing section, a major mechanical failure occurred when over 95% of the length had been pulled through. After multiple attempts to resume pullback by the HDD rigs and other onsite equipment were unsuccessful, the project team was left with the major challenge(s) of determining how else the crossing could be completed and the pipeline tied in on both sides of the river without incurring major business interruption in a busy industrial section of Richmond, BC. Moreover, FortisBC was faced with the possibility of having to abandon the project and the millions spent up to that point in time with no value. This paper will focus on how the project team overcame the challenge and mitigated long term operational issues that included maintaining adequate cathodic protection. Learn how the combined efforts of a multi-disciplined project team planned, designed, fabricated and ultimately successfully inserted an innovative casing sleeve, although unproven at the time and with its share of additional risks, after reviewing an extensive assessment of numerous alternatives as the optimum solution in order for FortisBC to finally complete the upgrade of its pipeline system.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.008
metaresearch head score (Gemma)0.017
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Case report · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.014
Threshold uncertainty score0.048

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0080.017
Meta-epidemiology (narrow)0.0010.001
Meta-epidemiology (broad)0.0000.001
Bibliometrics0.0010.000
Science and technology studies0.0050.002
Scholarly communication0.0040.004
Open science0.0020.004
Research integrity0.0030.004
Insufficient payload (model declined to judge)0.0140.004

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.009
GPT teacher head0.190
Teacher spread0.182 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designCase report
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2014
Admission routes1
Has abstractyes

Explore more

Same topicDrilling and Well Engineering→French-language works237,207→