Next Generation CANDU: Conceptual Design for a Short Construction Schedule

2002· article· en· W2074812036 on OpenAlexaffabout
J. M. Hopwood, Ian J. W. Love, Medhat Elgohary, Neville Fairclough

Bibliographic record

Venue10th International Conference on Nuclear Engineering, Volume 2 · 2002
Typearticle
Languageen
FieldMaterials Science
TopicGraphite, nuclear technology, radiation studies
Canadian institutionsAtomic Energy (Canada)
Fundersnot available
KeywordsScheduleCritical path methodModular programmingConceptual designSystems engineeringEngineeringConstruction engineeringComputer scienceOperations researchEngineering managementReliability engineeringMechanical engineering

Abstract

fetched live from OpenAlex

Atomic Energy of Canada Ltd. (AECL) has very successful experience in implementing new construction methods at the Qinshan (Phase III) twin unit CANDU 6 plant in China. This paper examines the construction method that must be implemented during the conceptual design phase of a project if short construction schedules are to be met. A project schedule of 48 months has been developed for the nth unit of NG (Next Generation) CANDU with a 42 month construction period from 1st Concrete to In-Service. An overall construction strategy has been developed involving paralleling project activities that are normally conducted in series. Many parts of the plant will be fabricated as modules and be installed using heavy lift cranes. The Reactor Building (RB), being on the critical path, has been the focus of considerable assessment, looking at alternative ways of applying the construction strategy to this building. A construction method has been chosen which will result in excess of 80% of internal work being completed as modules or as very streamlined traditional construction. This method is being further evaluated as the detailed layout proceeds. Other areas of the plant have been integrated into the schedule and new construction methods are being applied to these so that further modularization and even greater paralleling of activities will be achieved. It is concluded that the optimized construction method is a requirement, which must be implemented through all phases of design to make a 42 month construction schedule a reality. If the construction methods are appropriately chosen, the schedule reductions achieved will make nuclear more competitive.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.003
metaresearch head score (Gemma)0.002
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Theoretical or conceptual · Consensus signal: none
GenreCandidate signal: Methods · Consensus signal: Methods
Teacher disagreement score0.022
Threshold uncertainty score0.063

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0030.002
Meta-epidemiology (narrow)0.0010.001
Meta-epidemiology (broad)0.0000.001
Bibliometrics0.0010.001
Science and technology studies0.0010.001
Scholarly communication0.0020.001
Open science0.0020.001
Research integrity0.0010.001
Insufficient payload (model declined to judge)0.0190.004

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.109
GPT teacher head0.259
Teacher spread0.150 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designTheoretical or conceptual
Domainnot available
GenreMethods

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2002
Admission routes2
Has abstractyes

Explore more

Same venue10th International Conference on Nuclear Engineering, Volume 2Same topicGraphite, nuclear technology, radiation studiesFrench-language works237,207