MétaCan
Menu
Back to cohort
Record W2076864685 · doi:10.3992/jgb.5.4.78

Prospecting for Silver Striking Platinum: Our First LEED Project

2010· article· en· W2076864685 on OpenAlexaff
James MacGillivray, Gregory T Hicks, Steve Adams, Sue Barnett, Bryan Bobrick, David P. Graham, Morgan Royce, Rick Weber, Greg Miller, James Wernicke

Bibliographic record

VenueJournal of Green Building · 2010
Typearticle
Languageen
FieldDecision Sciences
TopicConstruction Project Management and Performance
Canadian institutionsResponse Biomedical (Canada)
Fundersnot available
KeywordsProspectingArchitectural engineeringPlatinumEngineeringEnvironmental scienceEnvironmental economicsMining engineeringEconomicsChemistry

Abstract

fetched live from OpenAlex

Abstract Prospecting demands positive future orientation, hope, sometimes not even knowing what it is you might discover. We were hopeful prospectors on our first LEED project, not exactly sure what we might strike. We sought silver sustainability for the University of New Mexico (UNM) College of Education Building (COE); what we discovered was even more precious and rare, platinum. Getting there entailed chipping away at each sustainable LEED credit until we hit pay dirt, the first publicly-funded and second LEED Platinum building in New Mexico. Gregory T. Hicks & Associates P.C. Architects was contracted by UNM to design a LEED Silver Certified building for its new COE Administration and Classroom Building, Phase 1. All new, state-funded buildings in New Mexico must achieve a minimum LEED Silver certification as mandated by Governor's Executive Order. Two of our staff, Jim MacGillivray and Jay Davis, are LEED APs, and our Principal, Gregory T. Hicks, has taken several USGBC courses, but this being our first LEED project, we participated in additional study in LEED certification and sustainable design. We also hired an experienced sustainable design specialist to serve as our LEED AP, our lead prospector, Susan Barnett. Not knowing how easy or difficult it might be to achieve LEED Silver, the prudent approach was to strive for as many points as possible, so that if we lost a few points along the way we would still fulfill the obligations of our contract. UNM COE and other UNM staff championed this approach. Our initial strategy targeted LEED credits with minimal cost, those almost free, logical modifications that improve sustainability. Next, we focused on achieving four “Innovation in Design” credits, searching for ideas that would involve minor costs or creative design endeavor. UNM COE committed to a photovoltaic system for educational and research purposes as well as to purchase a renewable energy certificate. Our initial venture targeted up to 48 possible points, comfortably within Gold territory. We submitted our project to USGBC for design review as the project went out to bid. The design review denied a few points in some areas, but serendipitously awarded a few extra points in other areas. UNM COE supported the prospects of achieving Gold so we provided additional information to successfully appeal denied credits, which brought us back up to a potential of 48 points, assuming targeted points were awarded during the construction review. At this point we knew we would certainly achieve Silver, possibly Gold. Midway through construction, the COE Dean, Richard Howell, and COE Chief of Staff, Diane Gwinn, asked us if there might be a way to earn just 4 or more points to reach the 52 required for LEED Platinum. Steve Chavez, UNM Project Manager, strongly championed this effort. This seemed difficult, if not impossible at this juncture in the project, but we met with COE, UNM engineers, design engineers, LEED AP, and the contractor to brainstorm possibilities. We came up with eight possibilities, but not all were affordable, practical, or supported, so we whittled the eight down to five, but just before the construction review we lost one of the five, so we tried for four. When the USGBC completed their construction review, we learned we had scored 52 points awarded LEED Platinum certification. Partnership of UNM COE, architect, engineers, LEED APs, and contractor created this success through a relentless “can-do” attitude throughout the project, plus some luck. Boring down deeply, we sought Silver and struck Platinum. This narrative is organized according to the USGBC LEED credit rating system and highlights the sustainable accomplishments of the project along with lessons learned.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.003
metaresearch head score (Gemma)0.005
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Observational · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: none
Teacher disagreement score0.039
Threshold uncertainty score0.129

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0030.005
Meta-epidemiology (narrow)0.0000.001
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0010.000
Science and technology studies0.0120.003
Scholarly communication0.0070.003
Open science0.0020.010
Research integrity0.0040.005
Insufficient payload (model declined to judge)0.0390.009

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.100
GPT teacher head0.404
Teacher spread0.304 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designObservational
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2010
Admission routes1
Has abstractyes

Explore more

Same venueJournal of Green BuildingSame topicConstruction Project Management and PerformanceFrench-language works237,207