MétaCan
Menu
Back to cohort
Record W2129248434 · doi:10.1109/eicccc.2006.277248

Adaptation Options for Infrastructure Under Changing Climate Conditions

2006· article· en· W2129248434 on OpenAlexaff
Heather Auld, Don Maclver, Joan Klaassen

Bibliographic record

Venuenot available
Typearticle
Languageen
FieldEnvironmental Science
TopicFlood Risk Assessment and Management
Canadian institutionsEnvironment and Climate Change CanadaImpact
Fundersnot available
KeywordsAdaptation (eye)PrioritizationClimate changeRisk analysis (engineering)Computer scienceWorkaroundEnvironmental resource managementEnforcementContingency planClimate change adaptationCritical infrastructureEnvironmental planningBusinessEnvironmental scienceProcess managementComputer security

Abstract

fetched live from OpenAlex

Climate change has the potential to impact the safety of existing structures, to increase the frequency of weather-related disasters, to regionally increase premature weathering and to significantly change design criteria and engineering of structures. Because infrastructure built in current times is intended to survive for decades to come, it is critically important that adaptation options to climate change be developed today, incorporated into design and implemented as soon as possible. Prioritization of required adaptation actions will need to account for existing and future vulnerabilities, the variable lifecycles of structures and replacement and maintenance cycles. "No regrets" types of adaptation actions that are available today need to be applied as soon as possible. These include measures to reduce uncertainties in climatic design values, regularly updated climatic design values, enforcement of codes and standards, maintenance of climate data records and networks, consistent forensic analyses of infrastructure failures, regular maintenance scheduling and community disaster management planning. However, given the potential changes expected, it is also likely that many impacts on communities and infrastructure will lie outside of the coping ranges of infrastructure. When this occurs, engineering and planning practices will need account for these growing uncertainties while new adaptation options are developed over time.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.001
metaresearch head score (Gemma)0.004
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Simulation or modeling · Consensus signal: Simulation or modeling
GenreCandidate signal: Empirical · Consensus signal: none
Teacher disagreement score0.015
Threshold uncertainty score0.051

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0010.004
Meta-epidemiology (narrow)0.0010.000
Meta-epidemiology (broad)0.0000.001
Bibliometrics0.0010.001
Science and technology studies0.0010.001
Scholarly communication0.0020.003
Open science0.0010.002
Research integrity0.0020.001
Insufficient payload (model declined to judge)0.0150.001

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.008
GPT teacher head0.244
Teacher spread0.236 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designSimulation or modeling
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations39
Published2006
Admission routes1
Has abstractyes

Explore more

Same topicFlood Risk Assessment and ManagementFrench-language works237,207