MétaCan
Menu
Back to cohort
Record W2156244826 · doi:10.1002/ieam.5630030110

The integration of ecological risk assessment and structured decision making into watershed management

2007· article· en· W2156244826 on OpenAlexaboutno aff
D. Ohlson, Victor B. Serveiss

Bibliographic record

VenueIntegrated Environmental Assessment and Management · 2007
Typearticle
Languageen
FieldEnvironmental Science
TopicFlood Risk Assessment and Management
Canadian institutionsnot available
Fundersnot available
KeywordsWatershedEnvironmental resource managementStakeholderWatershed managementDecision support systemNatural resource managementDecision analysisEnvironmental planningEnvironmental scienceRisk analysis (engineering)Natural resourceBusinessEcologyComputer science

Abstract

fetched live from OpenAlex

Watershed management processes continue to call for more science and improved decision making that take into account the full range of stakeholder perspectives. Increasingly, the core principles of ecological risk assessment (i.e., the development and use of assessment endpoints and conceptual models, conducting exposure and effects analysis) are being incorporated and adapted in innovative ways to meet the call for more science. Similarly, innovative approaches to adapting decision analysis tools and methods for incorporating stakeholder concerns in complex natural resource management decisions are being increasingly applied. Here, we present an example of the integration of ecological risk assessment with decision analysis in the development of a watershed management plan for the Greater Vancouver Water District in British Columbia, Canada. Assessment endpoints were developed, ecological inventory data were collected, and watershed models were developed to characterize the existing and future condition of 3 watersheds in terms of the potential risks to water quality. Stressors to water quality include sedimentation processes (landslides, streambank erosion) and forest disturbance (wildfire, major insect or disease outbreak). Three landscape-level risk management alternatives were developed to reflect different degrees of management intervention. Each alternative was evaluated under different scenarios and analyzed by explicitly examining value-based trade-offs among water quality, environmental, financial, and social endpoints. The objective of this paper is to demonstrate how the integration of ecological risk assessment and decision analysis approaches can support decision makers in watershed management.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.002
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesMeta-epidemiology (narrow)
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Observational · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.870
Threshold uncertainty score1.000

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0020.000
Meta-epidemiology (narrow)0.0010.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0010.001
Scholarly communication0.0000.000
Open science0.0000.002
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.006
GPT teacher head0.272
Teacher spread0.265 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

Study designObservational
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations26
Published2007
Admission routes1
Has abstractyes

Explore more

Same venueIntegrated Environmental Assessment and ManagementSame topicFlood Risk Assessment and ManagementFrench-language works237,207