MétaCan
Menu
Back to cohort
Record W2182695012 · doi:10.12821/ijispm030103

Defining Building Information Modeling implementation activities based on capability maturity evaluation: a theoretical model

2022· article· en· W2182695012 on OpenAlexafffund
Romain Morlhon, Robert Pellerin, Mario Bourgault

Bibliographic record

VenueInternational journal of information systems and project management · 2022
Typearticle
Languageen
FieldEngineering
TopicBIM and Construction Integration
Canadian institutionsPolytechnique Montréal
FundersCentre interuniversitaire de recherche sur les reseaux d'entreprise, la logistique et le transportPolytechnique Montréal
KeywordsBuilding information modelingMaturity (psychological)Capability Maturity ModelProcess managementComputer scienceService Integration Maturity ModelArchitectureKnowledge managementInformation modelSystems engineeringEngineeringEngineering managementRisk analysis (engineering)Software engineeringBusinessOperations managementSoftware

Abstract

fetched live from OpenAlex

Building Information Modeling (BIM) has become a widely accepted tool to overcome the many hurdles that currently face the Architecture, Engineering and Construction industries. However, implementing such a system is always complex and the recent introduction of BIM does not allow organizations to build their experience on acknowledged standards and procedures. Moreover, data on implementation projects is still disseminated and fragmentary. The objective of this study is to develop an assistance model for BIM implementation. Solutions that are proposed will help develop BIM that is better integrated and better used, and take into account the different maturity levels of each organization. Indeed, based on Critical Success Factors, concrete activities that help in implementation are identified and can be undertaken according to the previous maturity evaluation of an organization. The result of this research consists of a structured model linking maturity, success factors and actions, which operates on the following principle: once an organization has assessed its BIM maturity, it can identify various weaknesses and find relevant answers in the success factors and the associated actions.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.007
metaresearch head score (Gemma)0.013
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Theoretical or conceptual · Consensus signal: Theoretical or conceptual
GenreCandidate signal: Empirical · Consensus signal: none
Teacher disagreement score0.007
Threshold uncertainty score0.038

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0070.013
Meta-epidemiology (narrow)0.0010.001
Meta-epidemiology (broad)0.0000.001
Bibliometrics0.0070.004
Science and technology studies0.0010.003
Scholarly communication0.0060.009
Open science0.0020.003
Research integrity0.0020.002
Insufficient payload (model declined to judge)0.0040.001

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.012
GPT teacher head0.279
Teacher spread0.267 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designTheoretical or conceptual
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations16
Published2022
Admission routes2
Has abstractyes

Explore more

Same venueInternational journal of information systems and project managementSame topicBIM and Construction IntegrationFrench-language works237,207