STAGE 1 OF SUBSIDENCE MONITORING OF THE AREA SURROUNDING SALTO CAXIAS POWER DAM, IN BRAZIL
Bibliographic record
Abstract
The Electricity Company of Parana, has built a series of hydroelectric power dams along the Iguacu River, located in Southern Brazil. The last one is the Salto Caxias Power Dam. This is a concrete dam, 67 meters high. The filling of this dam is expected to flood an area equal to 141 km 2 , corresponding to a volume of 3.6 × 10 9 m 3 . Before the closing of the dam itself, a monitoring network of as many as 100 points was implement on the ground, encircling the area to be flooded. Additional control points external do this area were also implemented. The objective of the network is to determine the subsidence of the surrounding area. Gravimeter, geodetic levelling and GPS occupied the points of both networks in a first field campaign, which took place during 1998. A new field campaign will be carried out some time after the reservoir reaches its peak. This paper describes the design and implementation of the network and some characteristics of the fieldwork. Emphasis is given to the processing and analysis of the GPS collected data.
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
How this classification was reachedexpand
Full frame distilled prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.
Codex and Gemma teacher scores by category
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.000 | 0.000 |
| Meta-epidemiology (narrow) | 0.000 | 0.000 |
| Meta-epidemiology (broad) | 0.000 | 0.000 |
| Bibliometrics | 0.000 | 0.000 |
| Science and technology studies | 0.000 | 0.000 |
| Scholarly communication | 0.000 | 0.000 |
| Open science | 0.000 | 0.000 |
| Research integrity | 0.000 | 0.000 |
| Insufficient payload (model declined to judge) | 0.000 | 0.000 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from itClassification
machine, unvalidatedMachine predicted; a candidate call from one teacher head, not a consensus.
How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".