Change Order Management Factors in Building Projects in Northern Nigeria

2015· article· en· W2206626246 on OpenAlexvenueno aff
Richard Adegboyega Kolawole, Kamau K. Peter, Munala Gerryshom

Bibliographic record

VenueAsian Social Science · 2015
Typearticle
Languageen
FieldDecision Sciences
TopicConstruction Project Management and Performance
Canadian institutionsnot available
Fundersnot available
KeywordsAbandonment (legal)Change orderOrder (exchange)Stratified samplingBusinessQuestionnaireArbitrationOperations managementContract managementChange management (ITSM)Service (business)Index (typography)Project managementMarketingEngineeringComputer scienceProject planningManagementFinanceEconomicsMathematicsPolitical scienceStatistics

Abstract

fetched live from OpenAlex

<p>A change is an amendment or addition with respect to the original plans, specification or other contract documents and vital factor in construction project management. A change order is an instruction from an employer approving a change. Construction projects in Nigeria have suffered deleteriously as a consequence of extensive change orders, which has manifested in cost and time overruns, disputes, arbitration, litigation and even the abandonment of projects and this negatively impacts on the efficiency of the Nigerian construction industry.This paper explore the extent change order management strategies correlate with overall building project in Nigeria. Thirty strategies for managing change order were identified through intensive literature search. Twenty -one factors peculiar to the Nigerian construction industry were used to develop a questionnaire. A total of 323 questionnaires were administered through stratified random sampling to respondents in the cities of Abuja, Kano and Bauchi. The study targeted construction Consultants namely Architects, Quantity Surveyors Building Engineers, Service Engineer (Electrical & Mechanical), Contractor and Building owners in three sub-study cities. The study recorded an overall response rate of 80.8 %. Using SPSS version 22, the questionnaire was subjected to reliability test. Statistical analysis was used using average index; spearman correlation coefficient; factor analysis and multiple regression were used to analysis data from survey questionnaire. The study reveal that change orders are better manage at the design stage and that clear and thorough project brief, better initial planning and thorough detailing of design are the three topmost management strategies. The study established that overall project success is impacted by change order management with a R<sup>2</sup> of 0.252, meaning that change order management at the design stage accounts for 25.2% of the variation in building project outcomes. The Spearman's (rho) also show strong agreement among respondents. The study concluded that proper adoption and use of project implementation phase principles by project sponsor, increased effort at the design stage of projects by project participant and allocation of adequate resources to project requirement will help minimize change orders in project delivery in Northern Nigeria.</p>

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.004
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Observational · Consensus signal: Observational
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.306
Threshold uncertainty score0.420

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0040.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0010.008
Science and technology studies0.0000.000
Scholarly communication0.0000.001
Open science0.0010.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.147
GPT teacher head0.386
Teacher spread0.239 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designObservational
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations2
Published2015
Admission routes1
Has abstractyes

Explore more

Same venueAsian Social ScienceSame topicConstruction Project Management and PerformanceFrench-language works237,207