MétaCan
Menu
Back to cohort
Record W2290179840

Investigating the impact of building information modeling on collaboration in the architecture, engineering, construction and operations industry

2015· article· en· W2290179840 on OpenAlexaboutno aff
Érik Poirier

Bibliographic record

VenueEspace École de technologie supérieure (École de technologie supérieure) · 2015
Typearticle
Languageen
FieldEngineering
TopicBIM and Construction Integration
Canadian institutionsnot available
Fundersnot available
KeywordsArtifact (error)Context (archaeology)Building information modelingKnowledge managementDesign science researchProject managementDesign scienceComputer scienceProcess (computing)Management scienceEngineeringProcess managementInformation systemSystems engineeringOperations management
DOInot available

Abstract

fetched live from OpenAlex

The research work presented in this thesis investigates collaboration in the Architecture, Engineering, Construction and Operations (AECO) industry. More precisely, it investigates the characteristics of collaboration, their dynamics in the context of temporary and permanent organizations as well as the impact that the transition to innovative project delivery approaches, namely Building Information Modeling (BIM), is having on this collaboration. The research was practically motivated through our industrial partners’ desire to better understand the impact of BIM and other innovative project delivery approaches on project outcomes. The research was theoretically motivated by the lack of a clear definition of collaboration in the AECO industry and its seemingly amorphous nature. This scarcity of systematic and structured approaches to investigate collaboration and its outcomes in the literature confirmed this.
\n
\nThe research was therefore both exploratory and prescriptive in nature. Its principal aim was to develop an artifact that allows consistent development, management and assessment of innovation enabled collaboration. As such, the research project was conducted using a design science research design. The research process continuously iterated between the development and building of the artifact and its local evaluation in context. In parallel, the artifact was concurrently evaluated to ensure its relevance and maintain the rigor of its development. A critical realist perspective was adopted to frame the epistemic and ontological foundation of knowledge being developed and also contradistinguish the predominantly pragmatic perspective traditionally adopted in design science research. The development and building of the artifact followed a systematic combining methodology. Showing similarities with grounded theory, this particular methodology accepts the a priori framing of knowledge to inform the investigation. It recognizes also that the knowledge held within this frame will evolve as the project progresses and as new insight is gained into the phenomena Under investigation. Mixed-methods of data collection were conducted on two main research sites to inform and support the research project. The first site was that of a large institutional designbuild project located in Edmonton, Alberta. Data collection on this site started in February 2013 and is still being carried out. The data collected on this site allowed an in-depth investigation of collaboration within a temporary project organization having fully implemented BIM. The second site was that of a specialty mechanical contracting small enterprise located in Vancouver, British Columbia. Data collection on this site started in April 2012 and ended in April 2015. The data collected on this site allowed a breadth of investigation into collaboration from an organizational perspective. Data was collected on four other sites to support relevance checks of the artifact being developed.
\n
\nThe findings of the work are presented through the artifact, namely the constructs developed to characterize collaboration, a multi-layered model representing the relationships between the constructs and the method of operationalization of this model. The artifact serves to inform, manage and assess BIM-based collaboration in the context of this particular research work, though it could be extended to include other innovative project delivery approaches as future work. The artifact also evokes a substantive theory of collaboration in the AECO industry in the form of alignments amongst constructs developed in the model. Lastly, the artifact is operationalized to investigate the impact of BIM on collaboration in the AECO industry. The evolution of the different constructs and indicators, both measured and perceived, the alignments and misalignments uncovered as well as the outcomes of collaboration are evaluated through the artifact. Furthermore, the evolution of the constructs and the alignments uncovered through the artifact can serve as an indicator of performance within collaborative environments. Thus, the artifact developed in this research project solves the problem that was set out by the industrial partners. It also addresses the gap that was uncovered in the literature with respects to collaboration through innovation. Further work is required to fully evaluate the artifact, however, it is believed that the groundwork to move towards a more systematic and structured investigation into collaboration in the AECO industry has been laid.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.001
metaresearch head score (Gemma)0.002
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesMeta-epidemiology (narrow)
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Simulation or modeling · Consensus signal: Simulation or modeling
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.125
Threshold uncertainty score1.000

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0010.002
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0010.002
Science and technology studies0.0000.000
Scholarly communication0.0000.001
Open science0.0010.000
Research integrity0.0010.002
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.014
GPT teacher head0.262
Teacher spread0.248 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

Study designSimulation or modeling
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations3
Published2015
Admission routes1
Has abstractyes

Explore more

Same venueEspace École de technologie supérieure (École de technologie supérieure)Same topicBIM and Construction IntegrationFrench-language works237,207