MétaCan
Menu
Back to cohort
Record W2522903180 · doi:10.1115/ipc2000-149

Remedial Protection of a Pipeline Crossing of the River Wye, UK

2000· article· en· W2522903180 on OpenAlexaff
K. Bruce Dean, Femi Ade, Les Sawatsky, R. Michael Gray, John Cutler, Neil Wheeler

Bibliographic record

Venuenot available
Typearticle
Languageen
FieldEngineering
TopicGeotechnical Engineering and Underground Structures
Canadian institutionsGolder Associates (Canada)
Fundersnot available
KeywordsRiprapPipeline transportChannel (broadcasting)Remedial actionBankDredgingExcavationEnvironmental scienceRemedial educationHydrology (agriculture)Civil engineeringGeotechnical engineeringGeologyMining engineeringEngineeringEnvironmental remediationEnvironmental engineering

Abstract

fetched live from OpenAlex

This project is of interest to those involved in construction, siting and repair of pipeline crossings of rivers, streams and estuaries. In early 1999, Mainline Pipelines Limited discovered that their pipeline crossing of the River Wye had been exposed by river scour. Originally laid in 1972, the line provides petroleum products main supply from the port at Milford Haven to the Midlands, England, and operates at a high pressure. A break in or temporary shutdown of the pipeline would have had serious implications. Remedial protection options were needed rapidly, to ensure the integrity of the pipeline. A review of historical air photographs and maps, dating back to 1888, showed that the meandering channel of the River Wye has shifted to the north at an average rate of 0.65m per year. Thus, the remedial works would have to account for ongoing vertical and lateral scour. It was recognized that river training works would be required at the site to ensure continued protection of the pipeline in the long-term. The recommended design and remedial construction techniques allowed for safety issues, the potential impact on the river ecology, recreational river users, the river hydrology and restricted access to the steep northern riverbank. The design comprised filling of the eroded riverbed and bank with rock aggregate and placing a protective layer of graded rock riprap. Grout filled fabric formwork bags were placed beneath the pipeline to minimise deflection and the development of unacceptable stresses in the exposed length during rock placement. Rock filled wire mattresses were placed immediately on top of the pipeline to protect it from point loading of the angular riprap. A satellite guided positioning system was used to control material placement, and environmental monitoring of river water quality was carried out continuously during construction.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.001
metaresearch head score (Gemma)0.002
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Not applicable · Consensus signal: none
GenreCandidate signal: Other · Consensus signal: none
Teacher disagreement score0.068
Threshold uncertainty score0.135

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0010.002
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0010.000
Science and technology studies0.0040.001
Scholarly communication0.0020.001
Open science0.0010.003
Research integrity0.0010.001
Insufficient payload (model declined to judge)0.0180.002

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.006
GPT teacher head0.182
Teacher spread0.176 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designNot applicable
Domainnot available
GenreOther

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2000
Admission routes1
Has abstractyes

Explore more

Same topicGeotechnical Engineering and Underground StructuresFrench-language works237,207