MétaCan
Menu
Back to cohort

Draw rate optimisation in block cave production scheduling using mathematical programming

2017· article· en· W2769784901 on OpenAlexaff
Farshad Nezhadshahmohammad, Firouz Khodayari, Yashar Pourrahimian

Bibliographic record

Venuenot available
Typearticle
Languageen
FieldEngineering
TopicMining Techniques and Economics
Canadian institutionsUniversity of Alberta
Fundersnot available
KeywordsBlock (permutation group theory)Scheduling (production processes)Integer programmingLinear programmingComputer scienceProduction (economics)Mathematical optimizationControl (management)Production rateEngineeringIndustrial engineeringAlgorithmMathematics

Abstract

fetched live from OpenAlex

Among the underground mining methods available, caving methods are favoured because of their low cost and high production rates. Block caving operations offer a much smaller environmental footprint compared to equivalent open pit operations due to the much smaller volume of waste to be moved and handled. In general, draw control is fundamental to success or failure of any block cave operation. Establishing relationships among draw columns to consider depletion rates of other draw columns is complex but essential to provide a reasonable solution for real block caving mines. This paper presents a mixed-integer linear programming (MILP) model to optimise the extraction sequence of drawpoints over multiple time horizons of block cave mines with respect to draw control systems. A mathematical draw rate strategy is formulated in this paper to guarantee exact solutions. Draw control management provides optimal operating strategies while meeting practical, technical and environmental constraints. Furthermore, dilution and caving are improved indirectly, because the method considers the draw rate strategy according to geotechnical properties of the rock mass. Surface displacements are controlled by using the draw rate in all drawpoints during the life of the mine. Application and verification of the presented model for production scheduling based on the draw control system are presented using a case study.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Simulation or modeling · Consensus signal: Simulation or modeling
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.199
Threshold uncertainty score0.307

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.042
GPT teacher head0.274
Teacher spread0.232 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designSimulation or modeling
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations6
Published2017
Admission routes1
Has abstractyes

Explore more

Same topicMining Techniques and EconomicsFrench-language works237,207