MétaCan
Menu
Back to cohort

An application of mathematical programming and sequential Gaussian simulation for block cave production scheduling

2017· article· en· W2773311771 on OpenAlexaff
Saha Malaki, Firouz Khodayari, Yashar Pourrahimian, W Liu

Bibliographic record

Venuenot available
Typearticle
Languageen
FieldEngineering
TopicMining Techniques and Economics
Canadian institutionsUniversity of Alberta
Fundersnot available
KeywordsProfitability indexTime horizonScheduling (production processes)Computer scienceCaveOpen-pit miningLinear programmingProduction (economics)Block (permutation group theory)Mathematical optimizationInteger programmingNet present valueMining engineeringOperations researchAlgorithmEngineeringMathematicsArchaeologyGeography

Abstract

fetched live from OpenAlex

The current trend of deeper and lower-grade deposits makes open pit mining less profitable. Mass mining alternatives have to be developed if mining at a similar rate is to be continued. Block cave mining is becoming an increasingly popular mass mining method, especially for large copper deposits currently being mined with open pit methods. After finding the initial evaluation of a range of levels for starting the extraction of block cave mining, production scheduling plays a key role in the entire project’s profitability. Traditional long-term mine planning is based on deterministic orebody models, which can ignore the uncertainty in the geological resources. The purpose of this paper is to present a methodology to find the optimal extraction horizon and sequence of extraction for that horizon under grade uncertainty. The model does not explicitly take into account other potential project value drivers such as waste ingress into the draw column or the impact of primary or secondary fragmentation on either production or recovery. Maximum net present value (NPV) is determined using a mixed-integer linear programming (MILP) model after choosing the optimum horizon of extraction given some constraints such as mining capacity, production grade, extraction rate and precedence. Application of the method for block cave production scheduling using a case study over 15 periods is presented.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Simulation or modeling · Consensus signal: Simulation or modeling
GenreCandidate signal: Empirical · Consensus signal: none
Teacher disagreement score0.341
Threshold uncertainty score0.205

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.029
GPT teacher head0.300
Teacher spread0.272 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designSimulation or modeling
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations6
Published2017
Admission routes1
Has abstractyes

Explore more

Same topicMining Techniques and EconomicsFrench-language works237,207