MétaCan
Menu
← Back to cohort
Record W2886186484 · doi:10.14288/1.0368788

Value of pumped storage systems in British Columbia

2018· article· en· W2886186484 on OpenAlexaffabout
Jonathan van Groll

Bibliographic record

VenuecIRcle (University of British Columbia) · 2018
Typearticle
Languageen
FieldEngineering
TopicWater resources management and optimization
Canadian institutionsUniversity of British Columbia
Fundersnot available
KeywordsValue (mathematics)Environmental scienceComputer scienceMathematicsStatistics

Abstract

fetched live from OpenAlex

The need to establish electricity storage in British Columbia is brought by a regional and global shift towards the development of renewable electricity generation. The integration of renewable sources of power is challenging for system operators due to their inability to be dispatched. Energy storage enables a time lag between generation, transmission, and consumption. The unique characteristics of British Columbia, namely abundance of water and mountainous terrain, are well suited for the development of Pumped Hydro Storage (PHS). The goal of this thesis is to investigate the value of the integration of a PHS plant in the BC Hydro system at a high level of planning. BC Hydro’s Generalized Optimization Model, used for medium to long term planning, was modified to include PHS plants. The benefits of the PHS plant were considered as the incremental increase of the objective function of this optimization model compared to a base case. A method was developed to value PHS plants based on projected benefits and costs. A case study was performed using various configurations of PHS plants; including closed loop plants and one extension of an existing hydropower plant. Sensitivity analysis was performed to test the response of NPV over a number of inputs. As the capacity and storage of the closed loop plants increased, the usage also increased. Benefits were not uniform across the set of water years reflecting the characteristics of each year’s conditions and configuration of the BC Hydro system. The yearly benefit is highest for the extension of the existing hydropower plant. For the closed loop projects, the NPV is highest for the least amount of storage for each capacity. The NPV of all projects was most sensitive to the variation of construction costs. Complete cost recovery of these plants using revenues consisting of trade revenues and increased overall system is unlikely. Additional sources of benefits and revenue streams should be identified and included in future studies of PHS projects. This research can be extended to projects with more certain estimates of characteristics and costs.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.001
metaresearch head score (Gemma)0.002
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Simulation or modeling · Consensus signal: Simulation or modeling
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.125
Threshold uncertainty score0.252

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0010.002
Meta-epidemiology (narrow)0.0010.001
Meta-epidemiology (broad)0.0010.001
Bibliometrics0.0010.002
Science and technology studies0.0020.001
Scholarly communication0.0040.001
Open science0.0020.001
Research integrity0.0010.001
Insufficient payload (model declined to judge)0.0040.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.005
GPT teacher head0.143
Teacher spread0.138 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designSimulation or modeling
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2018
Admission routes2
Has abstractyes

Explore more

Same venuecIRcle (University of British Columbia)→Same topicWater resources management and optimization→French-language works237,207→