MétaCan
Menu
Back to cohort
Record W2897432083 · doi:10.22260/isarc2018/0124

BIM-based Surface-Specific Solar Simulation of Buildings

2018· article· en· W2897432083 on OpenAlexaffabout
Negar Salimzadeh, Faridaddin Vahdatikhaki, Amin Hammad

Bibliographic record

VenueProceedings of the ... ISARC · 2018
Typearticle
Languageen
FieldEngineering
TopicBIM and Construction Integration
Canadian institutionsConcordia University
Fundersnot available
KeywordsPhotovoltaic systemPhotovoltaic mounting systemArchitectural engineeringBuilding envelopeComputer scienceBuilding-integrated photovoltaicsSolar energyBuilding information modelingRooftop photovoltaic power stationElectricity generationEnvironmental scienceEngineeringPower (physics)MeteorologyElectrical engineering

Abstract

fetched live from OpenAlex

Photovoltaic (PV) solar energy is rapidly growing as an attractive alternative to fossil fuels. PV panels can harvest the solar power and turn it into a clean source of electricity. Traditionally, PV panels are only used on the rooftops of buildings. However, with the emergence of building-integrated solar panels in recent years, other surfaces on the building façade can be considered for the installation of PV panels. Given that different panels have different cost and performance profiles, it is of a cardinal importance to properly design the PV panels on the building facades to ensure a maximum benefit-cost ratio. Existing simulation and optimization methods do not discriminate between different types of surfaces of the building and treat the building envelope as a set of polygons. This can result in under- or over- design since there is a strong relationship between the type of the surfaces and the type of PV panels that can be attached to them or integrated with them. The advent of Building Information Modeling (BIM) in recent years has provided a rich platform for object-based evaluation and analysis of buildings. Nonetheless, currently, BIM is not used for a detailed and surface-specific simulation of building surfaces. In this research, a BIM-based method is developed for a detailed simulation of a building envelope using its surface properties. A prototype is developed using Dynamo visual programming platform to demonstrate the feasibility of the proposed method, and a case study is presented for a building in Montreal, Canada. In the light of the result of the case study, it can be concluded that the proposed method is promising in terms of providing the input for a comprehensive planning of the solar panel layout.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.001
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Simulation or modeling · Consensus signal: Simulation or modeling
GenreCandidate signal: Empirical · Consensus signal: none
Teacher disagreement score0.017
Threshold uncertainty score0.033

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0000.001
Meta-epidemiology (narrow)0.0010.001
Meta-epidemiology (broad)0.0010.001
Bibliometrics0.0010.001
Science and technology studies0.0010.001
Scholarly communication0.0010.001
Open science0.0010.001
Research integrity0.0010.001
Insufficient payload (model declined to judge)0.0060.001

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.013
GPT teacher head0.212
Teacher spread0.199 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designSimulation or modeling
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations14
Published2018
Admission routes2
Has abstractyes

Explore more

Same venueProceedings of the ... ISARCSame topicBIM and Construction IntegrationFrench-language works237,207