MétaCan
Menu
Back to cohort
Record W2909934087

Manajemen Produksi Program Kompas News Sukabumi

2018· dissertation· id· W2909934087 on OpenAlexaboutno aff
Lia Amelia

Bibliographic record

Venuenot available
Typedissertation
Languageid
FieldBusiness, Management and Accounting
TopicManagement and Optimization Techniques
Canadian institutionsnot available
Fundersnot available
KeywordsResearch methodBusinessOperations researchOperations managementEngineeringBusiness administration
DOInot available

Abstract

fetched live from OpenAlex

Kompas News Sukabumi program is one of information program in Kompas TV Sukabumi. This program presents phenomena and events around Sukabumi with detail discussed. Kompas News Program participated in introducing government programs, tours and Sukabumi Culture. Depth information about Sukabumi that was not on aired on other national television media become one of program character. Sometimes, the producer is not present for production program, but it does not become an obstacle for Kompas News Sukabumi to broadcast and this program has periods schedule such as program that exist on national television with limited human resources. Showed 7-9 news in a day, one of news content Kompas News program about Curug Awang as Niagara Mini in Canada become reference of candidate for Sukabumi leader to used as campaign tactics. The management carried out in a very long production process more efficient and can be done by 2 people only. The research aims to find out planning, organizing, actuating and controllong production Kompas News Sukabumi program. The research uses concept of Goerge R. Terry (Athoillah, 2010 : 96) about four management function : (1) Planning, (2) Organizing, (3) Actuating and (4) Controlling. This research used case study method with descriptive analysis. Collection data research from interview and observation result. The result of research planning production Kompas news program is the first step by all the crew involved in the program production to decide what to do, what steps to be done and who will be involved. Planning program production begins by discussing about issues planning, organizing planning, video planning and technique planning. Organizing program production is choose and decide who is doing the production process. Organizing program production begins by dividing the task temporarily and fixed. Actuating program production started from description all of crew and ending production with controlling. Controlling program production is control the production process to fit the plan. Controlling production divided by direct supervision, indirect supervision and evaluation

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.001
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesMeta-epidemiology (narrow), Scholarly communication, Insufficient payload (model declined to judge)
Consensus categoriesInsufficient payload (model declined to judge)
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Not applicable · Consensus signal: Not applicable
GenreCandidate signal: Other · Consensus signal: Other
Teacher disagreement score0.135
Threshold uncertainty score0.999

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0010.000
Meta-epidemiology (narrow)0.0010.001
Meta-epidemiology (broad)0.0010.000
Bibliometrics0.0010.002
Science and technology studies0.0010.000
Scholarly communication0.0030.002
Open science0.0010.000
Research integrity0.0010.000
Insufficient payload (model declined to judge)0.0210.006

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.014
GPT teacher head0.267
Teacher spread0.253 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; both teacher heads agree on what is shown here.

Study designNot applicable
Domainnot available
GenreOther

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2018
Admission routes1
Has abstractyes

Explore more

Same topicManagement and Optimization TechniquesFrench-language works237,207