MétaCan
Menu
Back to cohort
Record W2955865348 · doi:10.29173/mocs97

Mass Timber Modular Construction: Developments in Oregon

2019· article· en· W2955865348 on OpenAlexvenueno aff
Judith Sheine, Mark Donofrio, Mikhail Gershfeld

Bibliographic record

VenueModular and Offsite Construction (MOC) Summit Proceedings · 2019
Typearticle
Languageen
FieldEngineering
TopicBIM and Construction Integration
Canadian institutionsnot available
FundersNational Institute of Food and AgricultureTallWood Design InstituteU.S. Department of Agriculture
KeywordsModular designArchitectural engineeringEngineeringGovernment (linguistics)Scale (ratio)Frame (networking)Civil engineeringBusinessComputer scienceTelecommunicationsGeography

Abstract

fetched live from OpenAlex

With the mass timber industry taking off in 2015 in Oregon, when DR Johnson Lumber in Riddle, OR started producing CLT panels, government officials were eager to support it for its promise of economic development in rural communities and also had hopes of addressing the state’s affordable housing crisis using mass timber modular construction. While mass timber modular housing has had some success in Europe, the different construction standards and building culture in the United States make it more challenging. With few areas in Oregon in which housing is likely to be built over six stories tall or in large-scale developments, it did not seem possible that mass timber could solve the affordable housing crisis where it cannot compete in cost with standard light wood-frame construction. However, it did seem feasible that mass timber panels, which are so well-suited to customizable pre-fabrication through digital manufacturing, might be successful in an alternative building type for modular construction: classrooms. In successful models of mass timber modular classrooms in Austria and Germany, schools were built in much shorter timeframes and for 25% less cost than steel or concrete construction. The authors are now working with a modular building manufacturer in Oregon, Modern Building Systems (MBS), that produces custom-designed modular light wood-frame classrooms. While mass timber classrooms cannot compete in price with light wood-frame, particularly in single-story applications, they could be competitive for two story (or taller) schools, which are usually built using steel braced-frame and concrete block. Because MBS is 18 miles west of Freres Lumber, which is newly producing Mass Plywood Panels (MPP), and the MBS facility needs no modifications to use MPP instead of wood-frame, the authors are working with them to design an economically competitive mass timber module, with several potential clients interested in testing a prototype in 2019.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.001
metaresearch head score (Gemma)0.001
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Not applicable · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: none
Teacher disagreement score0.033
Threshold uncertainty score0.071

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0010.001
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0010.001
Science and technology studies0.0020.001
Scholarly communication0.0020.002
Open science0.0010.002
Research integrity0.0000.001
Insufficient payload (model declined to judge)0.0210.001

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.004
GPT teacher head0.169
Teacher spread0.165 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designNot applicable
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations2
Published2019
Admission routes1
Has abstractyes

Explore more

Same venueModular and Offsite Construction (MOC) Summit ProceedingsSame topicBIM and Construction IntegrationFrench-language works237,207