MétaCan
Menu
Back to cohort

Regulatory requirements for reclamation and closure planning at Alberta’s oil sands mines

2011· article· en· W2968092169 on OpenAlex

Why this work is in the frame

A frame that forgets how it found something cannot be audited. These are the routes that admitted this work.

aboutThe title or abstract carries a Canadian signal from the geographic lexicon.
no affNo Canadian affiliation: this work is invisible to an affiliation-only frame.
No Canadian affiliation. An affiliation-only frame, the usual design, would never have seen this work. It is one of the works that make the case for inverting the frame.

Bibliographic record

VenueMine closure · 2011
Typearticle
Languageen
FieldEnvironmental Science
TopicRangeland and Wildlife Management
Canadian institutionsnot available
Fundersnot available
KeywordsLand reclamationEnvironmental resource managementOil sandsGovernment (linguistics)Environmental planningWork (physics)Environmental scienceBusinessEngineeringGeography

Abstract

fetched live from OpenAlex

All oil sands mine operators are required to conserve and reclaim land disturbed for their operations, and to obtain a reclamation certificate under Alberta Environment (AENV)’s Environmental Protection and Enhancement Act (EPEA). Each operator is given specific operating approval conditions related to conservation, reclamation and closure activities. Other conditions identify what plans and reports must be submitted and authorised by AENV prior to implementation. AENV works closely with Alberta Sustainable Resource Development, the government department whose mandate includes managing forest resources, biodiversity, fish and wildlife. Using an adaptive management approach in response to new knowledge and technology, EPEA approval conditions are updated over time with changes specific to expectations associated with soil salvage and placement, wetland reclamation, annual reporting, and closure plan development, amongst other things. Since three major oil sands mine public hearings held in 2006, AENV has clarified expectations by updating approval conditions, providing industry specific templates for reporting, developing consistent and clear definitions, and defining a table of contents for upcoming reclamation and closure plan updates. Future reclamation plans and reports submitted to AENV by the operators will include data in a common geodatabase (GIS) format. Work is ongoing within the Government of Alberta to develop a comprehensive geodatabase for the mineable oil sands region, which will make information more easily accessible to regulators, industry, and the public. This paper will highlight the regulatory requirements related to conservation and reclamation activities at the oil sands mines, including but not limited to soil salvage, storage, and placement, revegetation, wildlife and biodiversity, and wetlands. The paper will focus on the recent efforts made by the regulators to ensure consistent and clear expectations surrounding submission of reclamation and closure plans as well as annual reporting requirements. A summary of the current status of the tree clearing, land disturbance and reclamation activities associated with the oil sands mines will be presented.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Observational · Consensus signal: Observational
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.098
Threshold uncertainty score0.595

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0010.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.036
GPT teacher head0.238
Teacher spread0.202 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it