MétaCan
Menu
Back to cohort
Record W3117344091 · doi:10.29173/mocs246

An Innovated Integrated Prefabricated Quarter System for the Migrant On-site Construction Workers of China

2015· article· en· W3117344091 on OpenAlexvenueaboutno aff
Tao Wang, Yulong Li, Guijun Li, Sijia Wu

Bibliographic record

VenueModular and Offsite Construction (MOC) Summit Proceedings · 2015
Typearticle
Languageen
FieldHealth Professions
TopicOccupational Health and Safety Research
Canadian institutionsnot available
FundersCentral University of Finance and EconomicsNational Natural Science Foundation of China
KeywordsChinaQuarter (Canadian coin)BusinessGovernment (linguistics)WorkforceMigrant workersConstruction industryEconomic growthRural areaEconomic shortageEngineeringGeographyPolitical scienceEconomics

Abstract

fetched live from OpenAlex

Migrant construction workers from rural communities are the main workforce in the Chinese construction industry and urban development. While far from hometown, most migrant construction workers live in temporary quarters, with poor conditions, on or near the construction site. Although there are standards set by the government to guarantee the basic health and safety conditions of such housing, migrant construction workers in China suffer some of the worst living conditions, even compared to migrant workers in other industries. Health and safety accidents occur often enough in workers’ quarters to provoke young laborers from rural areas to seek employment in the service industry, where better living conditions are available. As a result, serious labor shortages in the construction industry have emerged in China over recent years. There is a significant requirement for the industry to improve the condition of living quarters, by applying both technical and management methods. So far, very few articles have addressed the methods for improving the accommodations for rural migrant construction workers in urban China. This paper aims to develop an innovated integrated prefabricated (prefab) quarter system for the on-site construction workers in China. The paper first discusses the current status of the traditional construction workers’ quarters to disclose the most urgent problems in need of resolution. Barriers that block the innovation of improved workers’ quarters are listed. Then an innovated integrated prefab quarter system is introduced. The feasibility and applicability of the proposed system are discussed. The strengths of the system with regard to the management of health, safety, and environment are analyzed and compared to the traditional system. An actual pilot project is studied as the validation of the prefab quarter system.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.002
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Observational · Consensus signal: Observational
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.243
Threshold uncertainty score0.818

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0020.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.001
Science and technology studies0.0010.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.001
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.044
GPT teacher head0.354
Teacher spread0.310 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designObservational
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2015
Admission routes2
Has abstractyes

Explore more

Same venueModular and Offsite Construction (MOC) Summit ProceedingsSame topicOccupational Health and Safety ResearchFrench-language works237,207