On March 31, 2019, a 500 kV air-core, shunt reactor at a large generating station in BC Hydro was damaged shortly after four unit transformers were simultaneously energized from a 500 kV series and shunt compensated line source. Forensic investigations revealed that the controlled switching system, controlling the instant at which each breaker phase closes during energization to minimize inrush current, had failed. Uncontrolled closing led to under-damped, high-magnitude and sub-synchronous currents. Protection tripped and isolated the four transformers, followed shortly by shunt reactor protection tripping. Before the reactor could be isolated by circuit breakers, a damaging internal fault developed. This paper presents forensic investigation describing sequence of events leading up to reactor damage and shares the lessons learned with the peer utilities having similar installations.   
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
Full frame distilled prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.
Codex and Gemma teacher scores by category
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.000 | 0.000 |
| Meta-epidemiology (narrow) | 0.000 | 0.000 |
| Meta-epidemiology (broad) | 0.000 | 0.000 |
| Bibliometrics | 0.000 | 0.000 |
| Science and technology studies | 0.000 | 0.000 |
| Scholarly communication | 0.000 | 0.000 |
| Open science | 0.000 | 0.000 |
| Research integrity | 0.000 | 0.000 |
| Insufficient payload (model declined to judge) | 0.000 | 0.000 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it