MétaCan
Menu
Back to cohort
Record W3184099511 · doi:10.29173/mocs179

Construction-Centric Building Information Modelling to Facilitate Building Panel Prefabrication

2015· article· en· W3184099511 on OpenAlexafffundvenue
Hexu Liu, Gurjeet Singh, Youyi Zhang, Ming Lu, Mohamed Al‐Hussein

Bibliographic record

VenueModular and Offsite Construction (MOC) Summit Proceedings · 2015
Typearticle
Languageen
FieldEngineering
TopicBIM and Construction Integration
Canadian institutionsUniversity of Alberta
FundersNatural Sciences and Engineering Research Council of Canada
KeywordsPrefabricationBuilding information modelingEngineeringConstruction engineeringArchitectureArchitectural engineeringInterface (matter)Construction industryApplication programming interfaceProduction (economics)Civil engineeringComputer scienceOperations management

Abstract

fetched live from OpenAlex

Building information modelling (BIM) is an information technology that has the ability to change the Architecture, Engineering, and Construction (AEC) industry in terms of enhanced communication and productivity. With the rise of BIM, panelized/off-site construction is gaining momentum within the home building industry. However, BIM has not yet been leveraged to its full capability with regard to construction prefabrication, due in part to the fact that BIM models are only roughly designed by architects and engineers. Furthermore, some construction-centric information, such as drywall and sheathing layouts, which require substantial manual modelling efforts, is not presented explicitly in the BIM model. In this regard, this research exploits a BIMbased automatic approach for designing and modelling drywall and sheathing layouts in order to facilitate building panel production in the prefabrication plant. The prototype system is built on the basis of Autodesk Revit through the use of Application Programming Interface (API). This system, taking architectural BIM information as the input, generates a detailed constructioncentric BIM model in accordance with construction specifications, and further enables users to obtain shop drawings and a thorough quantity take-off and cut list in order to manage the plant production. In addition, the prototype system is capable of optimizing drywall and sheathing layout design with the objective of minimizing material waste and joint length. A case study of a wood-framed residential building is adopted to demonstrate the developed prototype system.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesMeta-epidemiology (narrow)
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Simulation or modeling · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.648
Threshold uncertainty score1.000

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0010.001
Science and technology studies0.0000.000
Scholarly communication0.0000.003
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.034
GPT teacher head0.203
Teacher spread0.169 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

Study designSimulation or modeling
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations1
Published2015
Admission routes3
Has abstractyes

Explore more

Same venueModular and Offsite Construction (MOC) Summit ProceedingsSame topicBIM and Construction IntegrationFrench-language works237,207