Construction Time Estimation Function for Canadian Utility Scale Power Plants

2021· article· en· W3196606717 on OpenAlexaffabout
Herve Christian Kabanda, Alex Romard, Fuze Yurtsever, Anjali Wadhera, Joshua Andrews, Craig G. Merrett

Bibliographic record

VenueEnergies · 2021
Typearticle
Languageen
FieldDecision Sciences
TopicConstruction Project Management and Performance
Canadian institutionsCarleton University
Fundersnot available
KeywordsRenewable energyEstimationHydroelectricityFunction (biology)Scale (ratio)Nameplate capacityPower stationWind powerSolar powerEngineeringEnvironmental economicsEnvironmental resource managementCivil engineeringPower (physics)Electricity generationEnvironmental scienceSystems engineeringGeographyEconomicsElectrical engineering

Abstract

fetched live from OpenAlex

Construction time and time overruns for infrastructure projects have been frequently studied; however, the construction time of power plants has not been studied. This lack of study is problematic, as more renewable energy power plants, such as wind and solar, are planned for many jurisdictions. Accurately estimating the construction time of a power plant will assist construction planning, budget estimates, and policy development encouraging the use of more renewable sources. The construction times of utility scale power plants in Canada were studied using publicly available data. Multiple linear regression analysis techniques were applied to the data to generate construction time estimation functions for all power plants together, and for individual technologies. The analyses reveal that construction time is sensitive to jurisdiction and the decade of construction, indicating that decisions made by individual Canadian provincial governments at different times had statistically significant impacts on construction time. The analyses also indicated that construction time is a strong function of installed capacity, independent of technology. This finding suggests that large solar or wind energy facilities will encounter longer construction times similar to large hydroelectric facilities.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.001
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesInsufficient payload (model declined to judge)
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Other design · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.881
Threshold uncertainty score0.998

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0010.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0000.000
Scholarly communication0.0000.001
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0030.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.040
GPT teacher head0.305
Teacher spread0.266 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

Study designOther design
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations1
Published2021
Admission routes2
Has abstractyes

Explore more

Same venueEnergiesSame topicConstruction Project Management and PerformanceFrench-language works237,207