MétaCan
Menu
Back to cohort
Record W3215135016 · doi:10.3390/w13233370

Removal of Cyanide and Other Nitrogen-Based Compounds from Gold Mine Effluents Using Moving Bed Biofilm Reactor (MBBR)

2021· article· en· W3215135016 on OpenAlexaboutno aff
Isaac Amoesih Kwofie, Henri Jogand, Myriam De Ladurantaye-Noël, Caroline Dale

Bibliographic record

VenueWater · 2021
Typearticle
Languageen
FieldAgricultural and Biological Sciences
TopicCassava research and cyanide
Canadian institutionsnot available
Fundersnot available
KeywordsEffluentReverse osmosisCyanideMoving bed biofilm reactorGold cyanidationNitrateEnvironmental scienceCyanateChemistryDissolved air flotationWaste managementEnvironmental engineeringPulp and paper industrySewage treatmentBiofilmInorganic chemistryEngineering

Abstract

fetched live from OpenAlex

Mining operations generate effluents containing pollutants such as ammonia, nitrite and nitrate as a result of blasting operations. Cyanide compounds such as free cyanide, cyanate and thiocyanate are also present when cyanide is used in the gold recovery process. In most cases, mine effluent stored in the ponds eventually needs to be discharged to the environment; however, the levels of contaminants often exceed the discharge limits hence cannot be discharged without treatment. Several treatment solutions exist for the removal of nitrogen compounds and cyanide. Reverse osmosis is often perceived as a good solution as it produces an effluent of high quality. However, reverse osmosis also produces a brine which is recycled to the ponds, gradually increasing the total dissolved solids (TDS) in the ponds over time. Biological treatment offers an alternative to reverse osmosis with the added benefit that nitrogen compounds are fully converted to innocuous nitrogen gas, which is released to the atmosphere, thereby offering a more sustainable treatment solution. Moving Bed Biofilm Reactors (MBBR) have been used successfully at several mines. In Quebec, a two stage MBBR was installed to remove OCN, SCN and NH4-N from the effluent prior to discharge. The MBBR plant has been in operation for 4 years; operating data will be presented to show that a fully compliant non-toxic effluent is discharged under a wide range of operating conditions. In Ghana, pilot trials were conducted at a gold mine to demonstrate complete removal of nitrogen compounds including CN, NH4-N, NO2-N and NO3-N using a four- stage MBBR system. Results from both systems are presented.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Bench or experimental · Consensus signal: Bench or experimental
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.024
Threshold uncertainty score0.675

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0010.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.037
GPT teacher head0.246
Teacher spread0.210 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designBench or experimental
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations5
Published2021
Admission routes1
Has abstractyes

Explore more

Same venueWaterSame topicCassava research and cyanideFrench-language works237,207