Special repairs to the Bersimis-1 generating tunnel walls to increase power production: a case study

2001· article· en· W4230870813 on OpenAlexvenueno aff
Jahangir Mirza, M S Mirza, V Roy, C. Lemire, K Saleh, S Tremblay

Bibliographic record

VenueCanadian Journal of Civil Engineering · 2001
Typearticle
Languageen
FieldEngineering
TopicTunneling and Rock Mechanics
Canadian institutionsnot available
Fundersnot available
KeywordsAbrasion (mechanical)CoatingEnvironmental scienceCementResistErosionGeotechnical engineeringEngineeringMaterials scienceComposite materialGeology

Abstract

fetched live from OpenAlex

The intake concrete tunnel at Bersimis-1 generating station is coated with a black sticky substance (slime) approximately 5 mm in thickness. Since the tunnel is 12 km long and has an average internal diameter of 9.45 m, the deposit represents a considerable obstacle to the production of electric power. The resulting loss of power generated is estimated to be around 39 MW per year, valued at 71 million dollars. Inspections in 1979, 1981, and 1983 showed that simply cleaning the surfaces would reduce the power losses but the slime built up again after a few years. A thin, smooth protective coating, containing anti-slime agents, compatible with the existing concrete could protect the surfaces against erosion and limit the slime deposit and its harmful effect on power production. The 1993 inspection provided an opportunity both to analyze the concrete, the slime itself, and the water and to experiment with the various methods of cleaning the surface and applying the different coating products. In 1994, 11 other products were selected for the specified characteristics and applied on concrete pipes and installed at two different locations: one consisted of submerged concrete specimens in the Bersimis river and in the second test setup, the products were installed by creating an artificial environment similar to the tunnel conditions using the tunnel water. The results showed that some products do not resist these conditions. Abrasion resistance tests in the laboratory confirmed these observations. One of the eleven products, a polymer-modified cement-based mortar, passed the submersion test and was applied to a small surface area (125 m 2 ) of the tunnel during a generating station shutdown in 1995. The thickness of the mortar required to cover the walls of the tunnel was between 2 and 3 mm. The total cost of repairing with the mortar was estimated to be between 10 and 11 million dollars. The size of the tunnel, its restricted accessibility, cleaning, ecological disposal of the slime, and the large quantities of material to be applied to cover the entire tunnel added to the complexity of the project.Key words: intake tunnel, power production, protective coating, slime deposit, surface cleaning.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.001
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Simulation or modeling · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.771
Threshold uncertainty score0.735

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0010.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.001
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.009
GPT teacher head0.189
Teacher spread0.180 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designSimulation or modeling
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations2
Published2001
Admission routes1
Has abstractyes

Explore more

Same venueCanadian Journal of Civil EngineeringSame topicTunneling and Rock MechanicsFrench-language works237,207