The new-normal challenges and IPD solutions: a Canadian case study

2022· article· en· W4281391534 on OpenAlexaffabout
Sara Rankohi, Mario Bourgault, Ivanka Iordanova

Bibliographic record

VenueBuilt Environment Project and Asset Management · 2022
Typearticle
Languageen
FieldDecision Sciences
TopicConstruction Project Management and Performance
Canadian institutionsÉcole de Technologie SupérieurePolytechnique Montréal
Fundersnot available
KeywordsOriginalityContext (archaeology)Knowledge managementProcess managementProject managementManagement scienceComputer scienceEngineeringSociologyQualitative researchSystems engineeringGeography

Abstract

fetched live from OpenAlex

Purpose According to the construction literature, the number of projects applying integrated project delivery (IPD) principles is expected to increase in the new-normal era. However, given that the pandemic is not yet fully over, accurate and measurable data are not yet available. Also, there is a lack of empirical studies that could provide guidelines as to the application of IPD principles at the various stages of construction projects. Thus, the goal of this paper is to address this knowledge gap through case studies. Design/methodology/approach This paper follows a multi-step research methodology, namely, a literature review, case study and focus group discussions in the context of Canadian construction projects. Findings Based on the conducted literature review and focus group discussions, the authors identified: (1) new challenges in the various stages of the construction projects' life cycle, (2) their related proximity aspects (technological, organizational, geographical and cognitive) and (3) IPD principles that can address the identified challenges within their associated proximities. The results show that IPD relational principles can improve a project's organizational and cognitive proximities, while IPD digital integrative principles can enhance a project's geographical and technological proximities. Originality/value This study contributes to the theoretical checklists of challenges that the construction industry has experienced since the beginning of the pandemic, and to the practical guidelines of implementation of IPD principles to meet these challenges. The conducted case studies are timely and relevant, and their results provide new insights for key project stakeholders into the application of IPD to tackle new-normal challenges based on their proximity perspectives.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.005
metaresearch head score (Gemma)0.008
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Qualitative · Consensus signal: Qualitative
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.087
Threshold uncertainty score0.635

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0050.008
Meta-epidemiology (narrow)0.0010.001
Meta-epidemiology (broad)0.0010.001
Bibliometrics0.0030.007
Science and technology studies0.0270.007
Scholarly communication0.0050.002
Open science0.0030.005
Research integrity0.0030.003
Insufficient payload (model declined to judge)0.0050.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.109
GPT teacher head0.322
Teacher spread0.213 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designQualitative
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations11
Published2022
Admission routes2
Has abstractyes

Explore more

Same venueBuilt Environment Project and Asset ManagementSame topicConstruction Project Management and PerformanceFrench-language works237,207