MétaCan
Menu
Back to cohort
Record W4294959713 · doi:10.3390/en15176465

Load Management and Optimal Sizing of Special-Purpose Microgrids Using Two Stage PSO-Fuzzy Based Hybrid Approach

2022· article· en· W4294959713 on OpenAlexaff
Fawad Azeem, Ashfaq Ahmad, Taimoor Muzaffar Gondal, Jehangir Arshad, Ateeq Ur Rehman, Sayed M. Eldin, Muhammad Shafiq, Habib Hamam

Bibliographic record

VenueEnergies · 2022
Typearticle
Languageen
FieldEngineering
TopicMicrogrid Control and Optimization
Canadian institutionsUniversité de Moncton
Fundersnot available
KeywordsMicrogridSizingParticle swarm optimizationFuzzy logicScheduling (production processes)Computer scienceMathematical optimizationEngineeringControl theory (sociology)Reliability engineeringControl engineeringControl (management)Operations managementMathematics

Abstract

fetched live from OpenAlex

The sizing of microgrids depends on the type of load and its operational hours. The significance of understanding the load operational characteristics in special purpose islanded microgrids is much needed for economic system sizing. The load operation of special-purpose microgrids often consumes high power for a short duration and remains idle most of the time, thus reducing the load factor. The inclusion of such loads in microgrid sizing causes huge capital costs making islanded microgrids an unfeasible solution. The islanded microgrid under study is an agricultural microgrid in a village having a small Crab Processing Plant (CPP) and a Domestic Sector (DS). The CPP constitutes the major power consumption. The community has a unique load consumption trend that is dependent on the highly uncertain parameter of availability of the crabs. Interestingly, crab availability is an independent parameter and cannot be accurately scheduled. The existing system sizing of the microgrid is performed based on the conventional methods that consider the CPP for full-day operation. However, the microgrid sources, especially the storage system may be reflected as oversized if the crab processing plants do not operate for several days due to the uncertain behavior of CPP causing enormous power wastage. In this paper, an integrated fixed and operational mode strategy for uncertain heavy loads is formulated. The proposed algorithm is based on the optimal sizing methodology aided by the load scheduling control strategy. The Particle Swarm Optimization technique is used for the optimal sizing integrated with the fuzzy logic controller to manage the available load. The membership functions are available excess power and the state of the charge of storage that defines the operational conditions for CPP. Based on input membership functions, the fuzzy controller decides on power dispatch in DS or CPP, keeping considerable SoC available for night hours. The simulation result shows that the time-dependent fuzzy controller approach manages to provide power to both sectors under optimal sizing while reducing the overall cost by 24% less than the existing microgrid.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Simulation or modeling · Consensus signal: Simulation or modeling
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.058
Threshold uncertainty score0.686

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.008
GPT teacher head0.193
Teacher spread0.185 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designSimulation or modeling
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations10
Published2022
Admission routes1
Has abstractyes

Explore more

Same venueEnergiesSame topicMicrogrid Control and OptimizationFrench-language works237,207