MétaCan
Menu
Back to cohort
Record W4306175755 · doi:10.1108/ecam-05-2022-0476

Pose estimation method for construction machine based on improved AlphaPose model

2022· article· en· W4306175755 on OpenAlexaboutno aff
Jiayue Zhao, Yunzhong Cao, Yuanzhi Xiang

Bibliographic record

VenueEngineering Construction & Architectural Management · 2022
Typearticle
Languageen
FieldHealth Professions
TopicOccupational Health and Safety Research
Canadian institutionsnot available
Fundersnot available
KeywordsPoseNormalization (sociology)Computer scienceArtificial intelligenceMachine learningMachine visionSoftwareData mining

Abstract

fetched live from OpenAlex

Purpose The safety management of construction machines is of primary importance. Considering that traditional construction machine safety monitoring and evaluation methods cannot adapt to the complex construction environment, and the monitoring methods based on sensor equipment cost too much. This paper aims to introduce computer vision and deep learning technologies to propose the YOLOv5-FastPose (YFP) model to realize the pose estimation of construction machines by improving the AlphaPose human pose model. Design/methodology/approach This model introduced the object detection module YOLOv5m to improve the recognition accuracy for detecting construction machines. Meanwhile, to better capture the pose characteristics, the FastPose network optimized feature extraction was introduced into the Single-Machine Pose Estimation Module (SMPE) of AlphaPose. This study used Alberta Construction Image Dataset (ACID) and Construction Equipment Poses Dataset (CEPD) to establish the dataset of object detection and pose estimation of construction machines through data augmentation technology and Labelme image annotation software for training and testing the YFP model. Findings The experimental results show that the improved model YFP achieves an average normalization error (NE) of 12.94 × 10 – 3, an average Percentage of Correct Keypoints (PCK) of 98.48% and an average Area Under the PCK Curve (AUC) of 37.50 × 10 – 3. Compared with existing methods, this model has higher accuracy in the pose estimation of the construction machine. Originality/value This study extends and optimizes the human pose estimation model AlphaPose to make it suitable for construction machines, improving the performance of pose estimation for construction machines.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.001
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Simulation or modeling · Consensus signal: none
GenreCandidate signal: Methods · Consensus signal: Methods
Teacher disagreement score0.008
Threshold uncertainty score0.016

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0000.001
Meta-epidemiology (narrow)0.0010.000
Meta-epidemiology (broad)0.0010.001
Bibliometrics0.0010.001
Science and technology studies0.0000.000
Scholarly communication0.0010.001
Open science0.0010.001
Research integrity0.0010.001
Insufficient payload (model declined to judge)0.0040.002

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.025
GPT teacher head0.384
Teacher spread0.359 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designSimulation or modeling
Domainnot available
GenreMethods

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations26
Published2022
Admission routes1
Has abstractyes

Explore more

Same venueEngineering Construction & Architectural ManagementSame topicOccupational Health and Safety ResearchFrench-language works237,207