A Tale of Two Out-of-Phase Synchronizing Events at BC Hydro

2023· article· en· W4377969978 on OpenAlexaff
Mukesh Nagpal, Lesley Gu, R. Barone, Ritwik Chowdhury, Michael J. Thompson

Bibliographic record

Venuenot available
Typearticle
Languageen
FieldEngineering
TopicPower Systems Fault Detection
Canadian institutionsBC Hydro (Canada)
Fundersnot available
KeywordsSynchronizingCircuit breakerSynchronismRelaySynchronization (alternating current)Computer scienceElectrical engineeringGenerator (circuit theory)BlackoutTransformerSwingVoltageElectric power systemEngineeringPower (physics)Transmission (telecommunications)

Abstract

fetched live from OpenAlex

This paper tells the tale of two out-of-phase synchronizing (OOPS) events that occurred at BC Hydro. A generator was synchronized 180 degrees out-of-phase without staff awareness of the faulty synchronization. During testing, the staff suspected a poor synchronization, after which the transient event records were investigated. The investigation concluded that the reference voltage signal was inverted because of a wiring error in the auxiliary voltage transformer (VT) circuit, which provided a common input to the autosynchronizer, synchroscope, and synchronism-check relay. The 16 kV generator breaker that is normally used to sync-close the unit to the system was equipped with OOPS protection, but the protection was not enabled because the breaker was closed before the event. A 500 kV breaker was used for synchronization; however, it was not equipped with OOPS protection, because the protection was not expected to perform well with high bus current ratings. During the OOPS event, many elements picked up, but none tripped. For instance, the loss-of-field and current unbalance elements asserted. However, because of their long time delays, these elements did not trip. The out-of-step protection qualified this disturbance as an event that did not cause an unstable power swing. The protection performed as designed, but it did not indicate poor synchronization. This paper provides an analysis of the different generator protection elements and discusses considerations for dedicated OOPS alarming and protection. This paper also discusses the follow-up diagnostics that were performed and provides recommendations to prevent the occurrence of a future OOPS event.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Bench or experimental · Consensus signal: Bench or experimental
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.349
Threshold uncertainty score0.435

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.019
GPT teacher head0.290
Teacher spread0.271 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designBench or experimental
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations1
Published2023
Admission routes1
Has abstractyes

Explore more

Same topicPower Systems Fault DetectionFrench-language works237,207