MétaCan
Menu
← Back to cohort
Record W4385724005 · doi:10.1061/9780784485026.041

Rehabilitating the Kildonan-Redwood Feeder Main River Crossing with a Flexible Fabric Reinforced Pipe (FFRP) Liner

2023· article· en· W4385724005 on OpenAlexaffabout
Jordan Thompson, Marv McDonald, Chris Macey, Kas Zurek, Stacy Cournoyer

Bibliographic record

Venuenot available
Typearticle
Languageen
FieldEngineering
TopicGeotechnical Engineering and Underground Structures
Canadian institutionsUniversity of WinnipegAecom (Canada)
Fundersnot available
KeywordsStructural engineeringGeotechnical engineeringComputer scienceGeologyEngineering

Abstract

fetched live from OpenAlex

The Kildonan-Redwood Feeder Main is a 600 mm (24 in.) diameter steel pressure pipe crossing of the Red River, adjacent to the Harry Lazarenko Bridge in Winnipeg, Manitoba, Canada. The feeder main was inspected in March 2019 as part of the city’s High Risk River Crossings (HRRC) program. The inspection consisted of an electromagnetic (EM) assessment using remote field testing (RFT) technology and multiple leakage tests. The EM inspections revealed that the steel crossing pipe was in relatively good condition structurally (e.g., it had full hoop strength); however, the leakage tests confirmed that its hydrostatic integrity was compromised, and the feeder main was removed from service to preclude direct discharge of chlorinated water to the river. The crossing was originally constructed in 1955, is 238 m (780 ft) long, and was constructed using a complex balance of tunneling on its west side, through a 16 m (52 ft) deep vertical shaft through a 90 degree to a horizontal tunnel section and then transitioning to shallow open-cut construction across the river and up its east side, using coffer dams to facilitate installation through the channel. Replacement of the crossing using new installation trenchless techniques was also deemed to be prohibitively expensive ($7−10 million). In 2019/2020, an AWWA Class III lining solution was designed and tendered using a reinforced CIPP for potable pressure service. However, the configuration was deemed to have excessive installation risk, and no bids were received. In 2020/2021, the use of FFRP, which was discarded in the initial predesign, was further investigated. It was found to have acceptable hydraulic impacts in review of the overall system, and its installation and long-term operational risk was deemed to be acceptable as well. In 2022, the project was tendered and successfully constructed for a cost of approximately $1.2 million or about 15% of the capital cost of a new installation with a comparable anticipated design life. This paper provides an overview of the long journey of the Kildonan-Redwood Feeder Main through its complex beginnings, modern assessment, and eventual rehabilitation to achieve a new design life.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.001
metaresearch head score (Gemma)0.001
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Not applicable · Consensus signal: none
GenreCandidate signal: Other · Consensus signal: none
Teacher disagreement score0.988
Threshold uncertainty score0.032

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0010.001
Meta-epidemiology (narrow)0.0010.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0010.000
Scholarly communication0.0010.001
Open science0.0010.001
Research integrity0.0010.001
Insufficient payload (model declined to judge)0.0100.002

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.007
GPT teacher head0.207
Teacher spread0.199 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designNot applicable
Domainnot available
GenreOther

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2023
Admission routes2
Has abstractyes

Explore more

Same topicGeotechnical Engineering and Underground Structures→French-language works237,207→