Curricular BIM implementation plan: protocol proposal and pilot application in Brazil

2024· article· en· W4390684474 on OpenAlexaff
Regina Coeli Ruschel, Caroline Kehl

Bibliographic record

VenueAmbiente Construído · 2024
Typearticle
Languageen
FieldEngineering
TopicBIM and Construction Integration
Canadian institutionsUniversity of Regina
Fundersnot available
KeywordsScope (computer science)Engineering managementPlan (archaeology)CurriculumCompetence (human resources)Protocol (science)Action planComputer scienceMaturity (psychological)Process managementProcess (computing)Knowledge managementEngineeringPolitical scienceManagementPedagogyMedicinePsychology

Abstract

fetched live from OpenAlex

Abstract Incorporating BIM in the education of professionals has become a demand and a topic of high importance for higher education. Several proposals for a curricular implementation of BIM exist. However, in most cases, they are specific to a single university or domain, do not consider academic policies or simplify practice by segmenting knowledge. This work proposes a protocol for the curricular implementation of BIM similar to the industry, considering aspects of process, technology, and policies aligned with the educational institution's mission and with existing competencies. Action research was the used method. Three actions were conducted: (1) proposition, (2) systematization and (3) application. The actions were executed in cycles incrementally, resulting in (1) guidelines, (2) supporting tools and (3) implementation plans. Two Brazilian universities participated in pilot studies of Project Construa Brasil. The pilot studies inspired a network of BIM cells that have synchronously applied curricular BIM implementation guidelines on a large scale. The guidelines proved to be generic and comprehensive, guiding the transformation with an empirical basis for the academics' decision-making. Leadership of a BIM specialist was confirmed as an essential factor of success. It is observed that even with a timid introduction of BIM competence in a limited scope of engineering solutions, the impact on the BIM maturity curriculum is significant.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Other design · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.759
Threshold uncertainty score0.441

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.007
GPT teacher head0.274
Teacher spread0.267 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designOther design
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations2
Published2024
Admission routes1
Has abstractyes

Explore more

Same venueAmbiente ConstruídoSame topicBIM and Construction IntegrationFrench-language works237,207