MétaCan
Menu
Back to cohort
Record W4402061194 · doi:10.1061/9780784485576.008

The Twists and Turns of Rehabbing a 70-Year-Old Trunk Sewer and Manholes in an Established Neighborhood

2024· article· en· W4402061194 on OpenAlexaffabout
Olugbenga Samuel Ibikunle, Chris Jones, Vijayakumar Chinnathambi

Bibliographic record

Venuenot available
Typearticle
Languageen
FieldEngineering
TopicGeotechnical Engineering and Underground Structures
Canadian institutionsStantec (Canada)
Fundersnot available
KeywordsTrunkComputer scienceGeologyForensic engineeringEngineering

Abstract

fetched live from OpenAlex

Lauderdale, located in north central Edmonton, has an 8 m deep 1950 trunk sewer system consisting of 750 mm diameter and 900 mm diameter RCP combined sewers, with several incoming lateral connections—including a 600 mm connection and seven sanitary manholes, one being a drop manhole. Following a series of inspection and condition assessment programs, the conveyance system was identified to be in poor-to-very poor structural condition. The wall loss alone was estimated to range between 50% and 80%, indicating a high risk of imminent localized failure. Additionally, 24 “Water Level Sag” defects were found along the trunk sewer. Wastewater samples revealed a high level of biological activity, possible anaerobic conditions, and high sulfide content, which were evident by the degree of H2S-induced deterioration observed and the odor nuisance issues in the neighborhood. The technical viability and overall suitability of various renewal methodologies were evaluated. Consideration was given to sanitary flow bypass requirements, trunk sewer structure and hydraulic capacity requirements, site constraints, and service life extension. CIPP was identified as the most viable renewal option for the sewer and geopolymer and epoxy coating for the manholes. Some project “twists and turns” included: (1) an 8 m deep sinkhole due to collapse of a section of the trunk sewer during the planning phase, (2) the existing drop-manhole was to be relocated away from the right-of-way of the future LRT project and to be replaced with a new 2,400 mm manhole, (3) the 2,400 mm manhole was to be installed at the sinkhole location, and it was to house a Hydro Vortex Flow Insert system required to address drop flow and odor issues, (4) chasing competent concrete along the RCP sewer for reconnection on both sides of the 2,400 mm manhole, leading to ~20 m long unexpected excavation, (5) five sections along the sewer with significant sagging were earmarked for open-cut replacement prior to re-lining. Liquification and soil sloughing were encountered, causing the team to change course, and (6) the 600 mm service pipe and one of the 250 mm CB leads reside beneath the right-of-way of the future LRT project, triggering the need to comply with applicable railway crossing design standards. This article shows how the rehabilitation activities leveraged collaborative and adaptive team efforts, as well as industry best practices and innovative solutions. Multiple lessons learned will be shared, as well as rehabilitation options evaluation, design criteria, constructability constraints and considerations, stakeholders’ management, construction approach, and QAQC requirements.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Case report · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.070
Threshold uncertainty score0.140

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0020.001
Scholarly communication0.0000.000
Open science0.0010.001
Research integrity0.0000.001
Insufficient payload (model declined to judge)0.0030.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.004
GPT teacher head0.199
Teacher spread0.195 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designCase report
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2024
Admission routes2
Has abstractyes

Explore more

Same topicGeotechnical Engineering and Underground StructuresFrench-language works237,207