MétaCan
Menu
Back to cohort

An extreme thermal cycling reliability test of ATLAS ITk Strips barrel modules

2024· article· en· W4403099425 on OpenAlexaff
A. Tishelman-Charny, A. A. Affolder, F. Capocasa, Emily Rose Duden, V. Fadeyev, M. Gignac, C. M. Helling, H. Herde, J. Johnson, D. Lynn, M. Morii, A. Mitra, L. Poley, G. Sciolla, S. A. Stucci, Punit Sharma, G. van Nieuwenhuizen, E. J. Wallin, Aiguo Wang, S. Wonsak

Bibliographic record

VenueJournal of Instrumentation · 2024
Typearticle
Languageen
FieldPhysics and Astronomy
TopicParticle Detector Development and Performance
Canadian institutionsSimon Fraser UniversityTRIUMFUniversity of British Columbia
FundersU.S. Department of Energy
KeywordsSTRIPSLarge Hadron ColliderUpgradeTemperature cyclingAtlas (anatomy)DetectorATLAS experimentBarrel (horology)Nuclear engineeringComputer scienceThermalEnvironmental scienceMechanical engineeringPhysicsNuclear physicsEngineeringMeteorologyTelecommunicationsOperating system

Abstract

fetched live from OpenAlex

Abstract At the end of Run 3 of the Large Hadron Collider (LHC), the accelerator complex will be upgraded to the High-Luminosity LHC (HL-LHC) in order to increase the total amount of data provided to its experiments. To cope with the increased rates of data, radiation, and pileup, the ATLAS detector will undergo a substantial upgrade, including a replacement of the Inner Detector with a future Inner Tracker, called the ITk. The ITk will be composed of pixel and strip sub-detectors, where the strips portion will be composed of 17,888 silicon strip detector modules. During the HL-LHC running period, the ITk will be cooled and warmed a number of times from about -35°C to room temperature as part of the operational cycle, including warm-ups during yearly shutdowns. To ensure ITk Strips modules are functional after these expected temperature changes, and to ensure modules are mechanically robust, each module must undergo ten thermal cycles and pass a set of electrical and mechanical criteria before it is placed on a local support structure. This paper describes the thermal cycling Quality Control (QC) procedure, and results from the barrel pre-production phase (about 5% of the production volume). Additionally, in order to assess the headroom of the nominal QC procedure of 10 cycles and to ensure modules don't begin failing soon after, four representative ITk Strips barrel modules were thermally cycled 100 times — this study is also described.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.001
metaresearch head score (Gemma)0.002
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Bench or experimental · Consensus signal: Bench or experimental
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.002
Threshold uncertainty score0.008

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0010.002
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0010.001
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0010.000
Research integrity0.0010.000
Insufficient payload (model declined to judge)0.0020.001

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.019
GPT teacher head0.271
Teacher spread0.253 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designBench or experimental
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations5
Published2024
Admission routes1
Has abstractyes

Explore more

Same venueJournal of InstrumentationSame topicParticle Detector Development and PerformanceFrench-language works237,207