MétaCan
Menu
Back to cohort
Record W4409603842 · doi:10.61091/jcmcc127b-171

Research on cooperative scheduling and power restoration strategy of intelligent operation and maintenance equipment under flood disaster based on dynamic planning

2025· article· en· W4409603842 on OpenAlexvenueno aff

Bibliographic record

VenueJournal of Combinatorial Mathematics and Combinatorial Computing · 2025
Typearticle
Languageen
FieldBusiness, Management and Accounting
TopicSafety and Risk Management
Canadian institutionsnot available
FundersChina Southern Power Grid
KeywordsFlood mythScheduling (production processes)Computer scienceOperations researchDisaster responseEmergency managementEnvironmental resource managementEnvironmental planningOperations managementEnvironmental scienceEngineeringGeographyPolitical science

Abstract

fetched live from OpenAlex

In order to cope with the damage of urban electricity and the dilemma of residents' electricity consumption caused by flooding disaster, we study the dynamic planning of intelligent operation and maintenance equipment scheduling and distribution network restoration under flooding disaster.Consideration is given to both pre-disaster deployment and post-disaster scheduling levels, while dynamic planning is carried out for collaborative repair and energy storage scheduling to construct a scheduling model with multi-source collaboration.Based on this, a multi-resource cooperative postdisaster recovery strategy for distribution networks is further proposed.The usability of this paper's multi-source cooperative strategy is studied in depth through case analysis.Among the six Cases of the simulation experiment, the total cost in Case 1, which is operated and restored according to the strategy proposed in this paper, is the lowest, which is only 257080.2RMB.The maximum, minimum, and average values of the solution time of the multi-source cooperative strategy are much faster than those of the comparison methods, and it has obvious advantages in fast decision making.The multisource synergy model in this paper is able to recover all the loads within 285 min, while the finite synergy model takes 330 min.The multi-source synergy model was able to recover 7,500 kW of load, while the limited synergy model was only able to recover 6,850 kW.The multi-source cooperative model has strong applicability.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.001
metaresearch head score (Gemma)0.001
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Simulation or modeling · Consensus signal: Simulation or modeling
GenreCandidate signal: Empirical · Consensus signal: none
Teacher disagreement score0.011
Threshold uncertainty score0.022

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0010.001
Meta-epidemiology (narrow)0.0010.000
Meta-epidemiology (broad)0.0010.001
Bibliometrics0.0010.001
Science and technology studies0.0010.001
Scholarly communication0.0010.002
Open science0.0010.001
Research integrity0.0010.001
Insufficient payload (model declined to judge)0.0010.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.034
GPT teacher head0.322
Teacher spread0.288 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designSimulation or modeling
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2025
Admission routes1
Has abstractyes

Explore more

Same venueJournal of Combinatorial Mathematics and Combinatorial ComputingSame topicSafety and Risk ManagementFrench-language works237,207