MétaCan
Menu
← Back to cohort
Record W612364093

Design-Build of a Major Transportation Project in York Region

2014· article· fr· W612364093 on OpenAlexaboutno aff
L Ng, Peter H. May, M Popok

Bibliographic record

VenueTransportation 2014: Past, Present, Future - 2014 Conference and Exhibition of the Transportation Association of Canada // Transport 2014 : Du passé vers l'avenir - 2014 Congrès et Exposition de 'Association des transports du Canada · 2014
Typearticle
Languagefr
FieldSocial Sciences
TopicTransportation Planning and Optimization
Canadian institutionsnot available
Fundersnot available
KeywordsScope (computer science)Transport engineeringProcess (computing)Transit (satellite)Work (physics)Bus rapid transitPaceEngineeringPublic transportComputer scienceGeography
DOInot available

Abstract

fetched live from OpenAlex

To help the York Region address their transportation needs for the future, the biggest transportation project in its history has been undertaken to construct rapid bus lanes along four major arterial roadways. Once constructed, the initial dedicated bus lanes for the Viva system will extend about 35 km by 2020. In consideration of the scope of this initiative, the Region understood early in the process that traditional methods for contract delivery would not be adequate for a project of this scope and magnitude, given the pace of delivery. The other consideration was also the complexity of the project, combining road, transit, and Intelligent Transportation System (ITS) elements and making sure they all worked together. With the success of the initial implementation of the Viva project “Quick Start” in 2005, involving bus rapid transit (BRT) in mixed traffic in two major corridors, the Region decided to continue with the design-build process for the following stages of work. York Region’s vivaNext programme is currently well underway. The programme is funded by the Province of Ontario through Metrolinx. Upon completion, rapid transit infrastructure will be owned by Metrolinx and operated by York Region. YRRTC continued with the design-build process similar to that was carried out in Quick Start. It will expand the dedicated bus lanes along some of the most heavily trafficked roads in the Region. Each contract undertaken as a part of the vivaNext programme had its own unique challenges. With each challenge, York Region has continued to adapt and modify their approach in handling the subsequent contracts. The focus of this paper will be to highlight some of the benefits and lessons learned in managing the design-build contracts.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.004
metaresearch head score (Gemma)0.003
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Not applicable · Consensus signal: none
GenreCandidate signal: Other · Consensus signal: none
Teacher disagreement score0.809
Threshold uncertainty score0.379

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0040.003
Meta-epidemiology (narrow)0.0010.001
Meta-epidemiology (broad)0.0000.001
Bibliometrics0.0010.001
Science and technology studies0.0040.002
Scholarly communication0.0030.002
Open science0.0020.003
Research integrity0.0010.002
Insufficient payload (model declined to judge)0.0230.004

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.011
GPT teacher head0.219
Teacher spread0.208 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designNot applicable
Domainnot available
GenreOther

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2014
Admission routes1
Has abstractyes

Explore more

Same venueTransportation 2014: Past, Present, Future - 2014 Conference and Exhibition of the Transportation Association of Canada // Transport 2014 : Du passé vers l'avenir - 2014 Congrès et Exposition de 'Association des transports du Canada→Same topicTransportation Planning and Optimization→French-language works237,207→